February 2026: Front Range Industrial Updates Unveiled!

Front Range Industrial: February 6, 2026 — Only new, verified moves

Institutional‑grade industrial across the Denver MSA (Ft. Collins to Castle Rock): development, acquisitions, leasing/marketing, for‑sale/for‑lease, land, and big‑box/manufacturing.

What’s newly confirmed since Feb 5

  • I‑70/Picadilly DDI — Commissioning window active. Aurora confirms traffic signal testing “as soon as Wednesday, Feb. 4,” alternating I‑70 lane closures Feb. 2–7 for final striping, and a one‑night Tower Rd off‑ramp closure as soon as Monday, Feb. 9. Oversize/overweight restrictions remain; pedestrian/bike access opens later this year. Aurora project page; Road construction update; Project overview note on finish work. (auroragov.org)

  • Amazon’s urban micro‑DCs — Permit filings show Amazon pursuing a 5,000 SF “distribution center” at 2030 N. Clay St. (Jefferson Park) and a ±4,500 SF site at 1860 Acoma St. (S. Broadway). These ultra‑fast nodes complement the company’s DIA‑area footprint. BusinessDen. (businessden.com)

  • DIA‑adjacent big‑box — Majestic Commercenter Building 12 listing refreshed; still marketing 120,000–461,832 SF, 36' clear, 97 docks, 117 trailer stalls, 4,000A power, “Available: Now.” LoopNet listing. (loopnet.com)

  • North I‑25 — Rockefeller Group confirms one remaining vacancy at 25 Commerce Park (Thornton): Building 1 ±131,250 SF, for sale or lease; divisible. Project site. (25commerceparkdenver.com)

  • Denali Logistics Park — Current marketing includes the 1,209,000 SF concept “Building 8” with year‑built variance across listings (2026 vs. 2027); treat schedule as verify‑in‑proposal. LoopNet 64th Ave page; Additional park page. (loopnet.com)

Fresh transactions and comps to log

  • Portfolio sale (I‑70 infill) — Atcap Partners purchased six northeast‑Denver industrial assets for $47M; most expensive industrial trade YTD (recorded Jan 26). Addresses span 51st Ave, Nome, Moline, and Lima streets. Bisnow. (bisnow.com)

  • Lease — Regional distribution (Commerce City) — Advance Stores Inc./Advance Auto Parts took 178,027 SF in Building II at Ascent Commerce Center; seven‑year term; building now full per owner. Confirmed by multiple sources and a new owner release. Mile High CRE, Bisnow deal sheet, Ambrose release, BusinessDen. (milehighcre.com)

  • IOS/low‑coverage infill sale — Steel Peak Properties acquired 4600 Monaco St., Denver (2.07 AC + 16,858 SF) for $3.27M; benchmark for yard‑heavy central infill. BusinessDen Pipeline; CityBiz. (businessden.com)

  • Northern Colorado sale — Aardex bought “Brands West” (Loveland), a two‑building, 187,457 SF Class‑A industrial campus, 100% leased; strong I‑25 corridor comp. PR Newswire; Mile High CRE. (prnewswire.com)

Tour‑ready Class A availabilities (re‑verified)

Central/infill and DIA‑adjacent

  • Prologis Business Center, Bldg 2 (5025 Florence St., Denver) — ±55K–133,602 SF; 30′ clear; 15 docks; 3 DIs; “Available Now.” Prologis page. (prologis.com)
  • Majestic Commercenter Bldg 12 (20600 E. 35th Dr., Aurora) — 120K–461,832 SF cross‑dock; 36′ clear; 97 docks; 117 trailer parks; 4,000A power; “Available Now.” LoopNet. (loopnet.com)
  • JAG Logistics Center @ DEN – Trade II (Aurora, AD zoning) — Suites from ±4K–37K SF; 30′ clear; outside‑storage optionality; OZ/EZ/FTZ advantages per listings. LoopNet Trade II; JAG campus listings. (loopnet.com)

North I‑25 / NoCo

Park‑scale DIA‑east and southeast Aurora

  • 470 Commerce (Outer Aurora — Newmark) — Phase 1 program ±526K SF (divisible to 30K). Listings show Bldg 1 at 141,200 SF with availability around Sep 2026; Phase 2 pages show initial space as early as May 2026. Flexible structures: lease, user sale, land sales, BTS. Bldg 1; Phase 1/2; Phase 2 Bldg 4/6. (loopnet.com)
  • Denali Logistics Park (Hines/Fulenwider) — Active marketing across multiple pads; concept Bldg 8 ±1.209 MSF posted; verify schedule assumptions (2026/2027) in proposals. LoopNet park pages, alt. page, Hines overview. (loopnet.com)

Central Denver infill (new/updated pages)

Development watch (big‑box and manufacturing‑capable)

  • I‑70/Picadilly DDI — Signals testing and alternating lane closures Feb. 2–7 indicate commissioning underway; intermittent closures will continue during finish work. Expect improved DIA‑east connectivity once fully activated. Aurora. (auroragov.org)

  • EastPark 70 (Aurora) — Building 7 (±117,493 SF) under construction; delivery currently shown as Q4 2025; front‑park/front‑load, 32′ clear, 29 docks. CBRE marketing site. (eastpark70.cbre-properties.com)

  • 470 Commerce (Outer Aurora) — 170‑acre program marketed up to ±2.1 MSF across phases; flexible lease/user‑sale/land BTS pathways; staged availabilities show mid‑ to late‑2026. LoopNet overview. (loopnet.com)

  • Denali Logistics Park (Aurora; AD zoning) — Park‑scale plan capable of >3 MSF at build‑out; concept Bldg 8 at ±1.209 MSF plus mid‑box options actively marketed. LoopNet park. (loopnet.com)

Land, IOS and small‑format logistics notes

  • IOS benchmark — 4600 Monaco St. (2.07 AC + 16,858 SF) traded for $3.27M mid‑January; useful yard‑heavy comp for central infill underwriting. BusinessDen Pipeline. (businessden.com)
  • JAG @ DEN land/BTS pathway — AD zoning/OZ/EZ/FTZ benefits; small‑bay and building‑level options show active marketing and BTS flexibility. JAG listings hub. (loopnet.com)
  • Urban last‑mile trajectory — Amazon’s sub‑10K SF “distribution” permits (Clay & Acoma) suggest incremental demand for centrally located, power‑ready industrial or flex; monitor for spillover requirements and traffic impacts. BusinessDen. (businessden.com)

Market snapshot (for underwriting)

  • CBRE Denver Industrial Q4 2025 (published Jan 8, 2026): direct vacancy 7.5% (−10 bps QoQ); Q4 net absorption +1.0 MSF; full‑year 2025 net absorption +3.6 MSF; Q4 leasing 2.9 MSF; Q4 sales $575M; pipeline ~3.3 MSF. CBRE Figures Q4 2025. (cbre.com)

  • National context: U.S. industrial vacancy held at 7.1% for a third straight quarter; H2 2025 demand accelerated; modest pickup in new starts. Cushman & Wakefield MarketBeat Q4 2025. (cushmanwakefield.com)

Access and infrastructure — plan your routes

  • I‑70/Picadilly commissioning: alternating lane closures Feb. 2–7; reduced closures as final striping completes; one‑night Tower Rd off‑ramp closure as soon as Feb. 9. Proceed with caution through the work zone. Aurora updates, Road construction updates. (auroragov.org)

Quick comp sheet (add to your model)

Shortlist to tour next (airport‑adjacent + central infill)

  1. Majestic Commercenter Bldg 12 (Aurora) — 120K–461,832 SF; cross‑dock; power and trailer count suit high‑throughput users. Listing. (loopnet.com)
  2. Prologis Business Center Bldg 2 (Denver) — ±55K–133,602 SF; infill reach with DIA/I‑70 access. Listing. (prologis.com)
  3. 25 Commerce Park Bldg 1 (Thornton) — ±131,250 SF; sale/lease; divisible; FTZ services. Project page. (25commerceparkdenver.com)
  4. JAG Logistics Center @ DEN – Trade II (Aurora) — multi‑tenant suites; AD zoning; optional yard/outside storage. Listing. (loopnet.com)
  5. Broadway Logistics Center (Denver) — ±145,746 SF remaining; 32′ clear; trailer capacity; central tax advantage. C&W page. (cushmanwakefield.com)

If you want, I can assemble a one‑page PDF with a comp table, current availabilities (specs/contacts), and a DIA‑east map tailored to your shortlist.