# Denver Industrial Deals: January Highlights Unveiled!

Newsy: Denver Industrial Real Estate
Published: 2026-01-28T14:02:00.497Z
Source: https://newsyai.com/edition/d8fe8eac-1709-476a-a1dc-2dcac4ef8ee0
Archive: https://newsyai.com/newsy/a39e5ebf-1943-41e2-b44d-ec38fbcc0415.md

---

# Front Range Industrial: January 28, 2026 — Fresh, verified moves only

Institutional‑grade industrial across the Denver MSA (Ft. Collins to Castle Rock): development, acquisitions, leasing/marketing, for sale/for lease, land, and big‑box/manufacturing.

## What’s newly confirmed since the last brief

- Capital markets — Atcap bought six I‑70 corridor industrial assets from an Investcorp portfolio for $47M, the largest Denver industrial sale year‑to‑date; parcels include assets on E. 51st Ave., Nome, Moline and Lima. Useful signal for multitenant, infill cap‑rates. ([bisnow.com](https://www.bisnow.com/denver/news/industrial/industrial-portfolio-north-of-denver-sells-for-47m-132886?utm_source=openai))

- DIA‑east access — Aurora’s project page continues to show an “early 2026” opening for the I‑70/Picadilly DDI, with lane shifts, detours and reduced speeds persisting; weekly city updates reiterate the same. Underwrite travel‑time friction through spring 2026. ([auroragov.org](https://www.auroragov.org/business_services/planning/projects__plans___studies/transportation_planning/i-70_picadilly_interchange?utm_source=openai))

- Big cross‑dock, tour‑ready now — Majestic Commercenter Building 12 is actively marketed with 120K–461,832 SF available; 36' clear, 97 docks, 117 trailer stalls, 4,000A power. Good Q1–Q2 2026 move‑in target. ([loopnet.com](https://www.loopnet.com/Listing/20600-E-35th-Dr-Aurora-CO/24402535/?utm_source=openai))

- North I‑25 (Thornton) — Rockefeller Group’s 25 Commerce Park shows Building 1 still the lone vacancy, ±131,250 SF; sale/lease; divisible; FTZ‑enabled services. Owner page refreshed within the last few days. ([rockefellergroup.com](https://www.rockefellergroup.com/developments/25-commerce-park/?utm_source=openai))

- Park‑scale BTS near DEN — Denali Logistics Park’s proposed Building 8 remains live at ±1,209,000 SF (2026) with total park availabilities ~2.77 MSF. ([loopnet.com](https://www.loopnet.com/Listing/TBD-68th-Ave-Aurora-CO/32310611/?utm_source=openai))

- Outer‑Aurora pipeline — 470 Commerce marketing remains active: Phase 1 three buildings totaling ±526K SF; flexible structures (lease, user sale, land 10–170 acres, BTS). Land listings are subdividable. ([loopnet.com](https://www.loopnet.com/Listing/470-Commerce-Bldg-1-Gun-Club-Rd-E-Exposition-Aurora-CO/34081804/?utm_source=openai))

- DIA‑adjacent small/mid‑bay — JAG Logistics Center @ DEN (Trade II) listing shows January on‑market date with AD zoning and demising options from ±4K–37K SF; total available cited around ±52.6K SF across floor/mezz. ([loopnet.com](https://www.loopnet.com/Listing/26122-E-68th-Ave-Aurora-CO/38987811/?utm_source=openai))

- DIA/I‑70 east construction tracker — Aero 70’s site‑details page lists Phase 1 delivering Q1 2026; the project overview notes Q3 2026. Treat as 1H–3Q 2026 pending next owner update. ([aero70.com](https://www.aero70.com/site-details?utm_source=openai))

## Fresh lease, sale and land comps (executed/reported recently)

- Lease — Distribution (I‑76 corridor): Advance Auto/Advance Stores Inc., 178,000 SF at Ascent Commerce Center, 7‑year term (executed Dec 2025; reported Jan 21, 2026). Largest Q4 2025 industrial lease. ([businessden.com](https://businessden.com/2026/01/21/auto-parts-retailer-leases-huge-warehouse-in-commerce-city/?utm_source=openai))

- Sale — NoCo stabilized Class A campus: Aardex acquired Brands West (two buildings, 187,457 SF) in Loveland; 100% leased at closing (Jan 14, 2026). Strong north‑corridor comp for modern manufacturing/distribution. ([streetinsider.com](https://www.streetinsider.com/Press%2BReleases/Aardex%2BAcquires%2BBrands%2BWest%2C%2Ba%2B187%2C457-Square-Foot%2BClass-A%2BIndustrial%2BCampus%2Bin%2BLoveland%2C%2BColorado/25848130.html?utm_source=openai))

- Portfolio sale — Central/northeast infill: Atcap’s $47M, six‑asset I‑70 corridor purchase (see above). Year‑to‑date Denver industrial high‑water mark. ([bisnow.com](https://www.bisnow.com/denver/news/industrial/industrial-portfolio-north-of-denver-sells-for-47m-132886?utm_source=openai))

## Active Class A availabilities to price and tour (re‑checked)

- Prologis Business Center, Bldg 2 (Central‑Airport infill) — 55K–133,602 SF; 30′ clear; 15 docks; 3 drive‑ins; ESFR; status “Available Now/2026” across owner pages. ([prologis.com](https://www.prologis.com/industrial-properties/building/den00902-prologis-business-center-building-2?utm_source=openai))

- Downtown Distribution Center (Central infill) — ±134,368 SF; low‑tax Unincorporated Adams; current owner listing live this month. ([cushmanwakefield.com](https://www.cushmanwakefield.com/en/united-states/properties/for-lease/warehousedistribution/co/denver/5601-franklin-street/s121100029s121100048-l?utm_source=openai))

- Broadway Logistics Center (Central infill) — Up to ~145,746 SF; 32′ clear; 46–57 docks; 50 trailer stalls; delivered; marketing current. ([loopnet.com](https://www.loopnet.com/Listing/20600-E-35th-Dr-Aurora-CO/24402535/?utm_source=openai))

- 25 Commerce Park, Bldg 1 (Thornton) — ±131,250 SF for sale/lease; divisible to sub‑±20K; trailer stalls; FTZ‑enabled services. ([rockefellergroup.com](https://www.rockefellergroup.com/developments/25-commerce-park/?utm_source=openai))

- Majestic Commercenter Bldg 12 (Aurora) — 120K–461,832 SF; cross‑dock; heavy trailer/car parking; power expandable. ([loopnet.com](https://www.loopnet.com/Listing/20600-E-35th-Dr-Aurora-CO/24402535/?utm_source=openai))

- JAG Logistics Center @ DEN (Aurora/DIA) — Trade II suites ±4K–37K SF (±52.6K total cited) with mezz options; AD zoning. ([loopnet.com](https://www.loopnet.com/Listing/26100-26120-E-68th-Ave-Aurora-CO/21121090/?utm_source=openai))

- Denali Logistics Park (Aurora) — Building 8 ±1.209 MSF (2026); multiple park availabilities from ±34,772 SF; BTS scale adjacent to DEN cargo corridors. ([loopnet.com](https://www.loopnet.com/Listing/TBD-68th-Ave-Aurora-CO/32310611/?utm_source=openai))

- 470 Commerce (Aurora — Newmark) — Phase 1 ±526K SF across three buildings; flexible deal structures; concurrent land offering 10–170 AC. ([loopnet.com](https://www.loopnet.com/Listing/470-Commerce-Bldg-1-Gun-Club-Rd-E-Exposition-Aurora-CO/34081804/?utm_source=openai))

- EastPark 70, Building 7 (Aurora) — 117,493 SF; 32' clear; final building in park; listings show 2025–26 delivery window. ([cbre.com](https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-173032/eastpark-70-building-7-2379-ensenada-street-aurora-co-80011?utm_source=openai))

## Development watch

- Aero 70 (United Properties/CBRE) — Phase 1 under construction; delivery guidance varies by page (Q1 2026 vs. Q3 2026). Monitor for next formal update; specs include 419,070 SF and 398,405 SF cross‑docks. ([aero70.com](https://www.aero70.com/site-details?utm_source=openai))

- Denali Logistics Park — Proposed 1.209 MSF Building 8 (2026) plus park‑wide availabilities (~2.77 MSF currently marketed). ([loopnet.com](https://www.loopnet.com/Listing/TBD-68th-Ave-Aurora-CO/32310611/?utm_source=openai))

- 470 Commerce (Aurora) — New 170± AC park; Phase 1 marketing live; subdividable land and user‑sale options alongside leasing. ([loopnet.com](https://www.loopnet.com/Listing/470-Commerce-Bldg-1-Gun-Club-Rd-E-Exposition-Aurora-CO/34081804/?utm_source=openai))

## Market context (latest)

- CBRE Denver Industrial Q4 2025: direct vacancy 7.5%; net absorption +1.0 MSF for Q4 (+3.6 MSF full‑year); leasing 2.9 MSF; Q4 sales $575M; pipeline ~3.3 MSF. Read‑through: slower new starts + steady demand = tightening large‑bay options into late‑2026. ([cbre.com](https://www.cbre.com/insights/figures/denver-industrial-figures-q4-2025?utm_source=openai))

## Access and infrastructure notes

- I‑70/Picadilly DDI — Opening targeted “early 2026.” Expect intermittent lane closures, detours and reduced speeds; plan tours and trucking accordingly through spring 2026. ([auroragov.org](https://www.auroragov.org/business_services/planning/projects__plans___studies/transportation_planning/i-70_picadilly_interchange?utm_source=openai))

---

If you want, I can compile a one‑page PDF with a comp table, active availabilities (specs, contacts) and a DIA‑east map for underwriting decks.
