# November Surge: Bare Metal Server Prices Rise! Newsy: Data Centre & Infrastructure Digest Published: 2026-11-07T18:06:03.074Z Source: https://newsyai.com/edition/b79d7d4e-a033-4f5f-be0f-af88eb4e8b2d Archive: https://newsyai.com/newsy/24c3f9f5-7850-4915-9942-f6be492ab1c1.md --- **# Intelligence Briefing: Bare-Metal Data Center Market – November 7, 2026** **Top 3** **Bare Metal Server Price Index median monthly rate rises to $229.21 as of November 7, 2026.** Public list prices show a median of $229.21 monthly and $0.68 hourly across tracked plans, up from prior levels around $196–$199. Primary source: [BareMetalIndex.com](https://www.baremetalindex.com/data/).[[1]](https://www.baremetalindex.com/data/) *Matters because the increase strengthens pricing power and margins for regional bare-metal operators competing against larger resellers and hyperscalers.* **FERC issues show-cause orders on November 6, 2026, directing all six U.S. RTOs/ISOs (including MISO, PJM, and SPP) to justify or reform large-load interconnection tariffs within 60 days.** The orders target data centers and similar loads, building on prior actions; a separate PJM proceeding addresses co-location with generation via new firm/non-firm contract demand transmission services. Primary source: [FERC.gov](https://www.ferc.gov/news-events/news/ferc-launches-aggressive-targeted-action-speed-large-load-integration).[[2]](https://www.ferc.gov/news-events/news/ferc-launches-aggressive-targeted-action-speed-large-load-integration) *Matters because reforms could alter timelines, costs, and feasibility for hyperscale projects in the Midwest, potentially creating openings for flexible regional capacity while hyperscalers face added scrutiny.* **Alliant Energy announces $15.9 billion capex plan for 2027–2030 (up 19%), driven by 3,400 MW contracted with five data centers expected online by 2031.** Three projects are under construction in its service area, including Google and QTS facilities in Cedar Rapids, Iowa, and Meta in Beaver Dam, Wisconsin; Industrial Info tracks 138 data centers valued at ~$112 billion in Iowa and Wisconsin. Primary source: [Industrial Info Resources](https://www.industrialinfo.com/news/article/data-centers-drive-up-capital-spending-plans-at-alliant--364574) (Nov. 5, 2026).[[3]](https://www.industrialinfo.com/news/article/data-centers-drive-up-capital-spending-plans-at-alliant--364574) *Matters because heightened utility investment and confirmed Iowa demand signal sustained regional load growth that may benefit nimble local operators amid hyperscale constraints elsewhere.* ## Data Center Industry — New Builds, Expansions, Closures, and M&A in the US; Iowa or Midwest Focus; Capacity and Vacancy Trends; Hyperscaler Expansion Plans **Alliant Energy data center contracts and capex increase (see Top 3).** *Matters because it confirms concrete near-term demand in Iowa and the Upper Midwest.* **Aterio’s November 2026 U.S. data center report notes continued expansion with projects advancing in Texas, Wisconsin, Kansas, Utah, Missouri, and Colorado (published Nov. 2, 2026).** Examples include Amazon exploring a campus near Danville, Missouri; Microsoft revising its Wisconsin 2 campus; and grading underway at Digital Realty’s Kansas site. Primary source: [Aterio](https://www.aterio.io/monthly-reports/us-data-centers/2026-11).[[4]](https://www.aterio.io/monthly-reports/us-data-centers/2026-11) *Matters because Midwest activity persists even as some projects face delays, highlighting contested but ongoing regional opportunities.* **LandGate Q4 2026 report finds 819 new U.S. data center projects announced in 2026 through October, exceeding all of 2025, with 6,561 projects tracked total (Nov. 4, 2026).** Development pipeline exceeds operating base in several regions including MISO and SPP; power and local approvals are now key bottlenecks. Primary source: [PR Newswire / LandGate](https://www.prnewswire.com/news-releases/2026-data-center-announcements-pass-all-of-2025-as-local-restrictions-spread-to-42-states-302929189.html).[[5]](https://www.prnewswire.com/news-releases/2026-data-center-announcements-pass-all-of-2025-as-local-restrictions-spread-to-42-states-302929189.html) *Matters because record announcements amid rising restrictions underscore a narrowing but still growing market where local operators may gain edge on smaller or constrained sites.* **Nothing significant** on new Iowa/Midwest-specific pipeline updates beyond the above, closures, M&A, or broader vacancy trends. ## Bare Metal and Dedicated Hosting Market — Pricing Changes, Renewal Increases, Outages, Acquisitions, or Product Moves **Bare Metal Server Price Index median monthly rate rises to $229.21 (see Top 3).** *Matters because higher public list prices support competitiveness for regional dedicated providers.* **Nothing significant** on outages, acquisitions, renewal increases, product moves, or customer-migration/forum sentiment from Latitude.sh, Hetzner, Hivelocity, Cherry Servers, OVHcloud, Equinix Metal (sunset fallout), Vultr, or new entrants. Hetzner and similar providers show stable post-hike pricing with no new changes reported. ## Narrative Opportunities — Public or Political Backlash, Cloud Price-Hike Coverage, Cloud-Repatriation Stories, Data Sovereignty Debates, “Big Tech vs. Local Community” Coverage **Poweshiek County, Iowa, passes a 12-month data center moratorium on October 31, 2026 (or until permanent zoning ordinances are established).** The 2-1 board vote follows resident concerns over water and electricity strain; the zoning commission is drafting rules. Primary source: [The Scarlet & Black](https://thesandb.com/57143/community/poweshiek-county-passes-moratorium-on-data-centers/).[[6]](https://thesandb.com/57143/community/poweshiek-county-passes-moratorium-on-data-centers/) *Matters because additional Iowa local restrictions reinforce “big tech vs. community” tensions, potentially favoring established smaller operators less likely to trigger opposition.* **Barnes County, North Dakota, extends its data center moratorium by six months (Nov. 5–6, 2026 vote).** Primary source: [NewsDakota](https://www.newsdakota.com/2026/11/06/barnes-county-commission-extends-data-center-moratorium/).[[7]](https://www.newsdakota.com/2026/11/06/barnes-county-commission-extends-data-center-moratorium/) *Matters because ongoing Midwest moratoria sustain a regulatory environment that can disadvantage large-scale projects.* **Nothing significant** on new national backlash coverage, cloud price hikes, repatriation, or data sovereignty stories beyond the local Iowa and broader election-related restriction trends already noted. ## Power and Energy — Grid Capacity Constraints, Power Pricing, Wind and Solar Generation in Iowa and the Midwest, Utility Deals with Data Centers, Energy-Related Permitting Fights **FERC large-load tariff orders (see Top 3).** *Matters because they directly target interconnection rules affecting Midwest grid operators and hyperscale demand.* **Xcel Energy pursues large-load tariffs in Minnesota, Wisconsin, Colorado, and Texas amid data center growth (reported Nov. 5, 2026).** The utility has >2 GW contracted and expects another GW in 2026, with partnerships for new generation. Primary source: [Utility Dive](https://www.utilitydive.com/news/xcel-energy-pursuing-large-load-tariffs-in-4-states-amid-data-center-growth/811518/).[[8]](https://www.utilitydive.com/news/xcel-energy-pursuing-large-load-tariffs-in-4-states-amid-data-center-growth/811518/) *Matters because new tariffs in neighboring states could influence power cost structures and hyperscale siting decisions near Iowa.* **Nothing significant** on new Iowa/Midwest wind/solar updates, specific utility deals, or permitting fights beyond the FERC actions and Alliant developments. ## GPU and AI Compute Market — Reserved vs. Spot Pricing Shifts, GPU Supply and Availability, Neocloud News, Teams Moving AI Workloads to Dedicated Hardware **Nothing significant** on reserved vs. spot pricing, GPU supply/availability, neocloud developments (CoreWeave, Lambda, Crusoe, Voltage Park), or explicit workload migrations to dedicated hardware. ## Blockchain Infrastructure (Brief) — Solana Validator Ecosystem News, Solana Foundation Delegation Program Changes, Validator Hosting and Hardware News, Monad Mainnet Progress **Nothing significant** on Solana validator ecosystem news, Foundation Delegation Program changes, validator hosting/hardware, or Monad mainnet progress. ## Regulation and Incentives — State Tax Incentives for Data Centers (Iowa Especially), Federal or State Regulation of Data Center Energy Use **FERC large-load tariff orders (see Top 3 and Power section).** *Matters because federal action on interconnections adds a new layer of regulatory pressure on large-load projects.* **Nothing significant** on new Iowa state tax incentives or additional state energy-use regulations. **Sources are primary where possible (operator data pages, grid operator announcements, local/regional reporting). All items are new or materially updated relative to the October 30 edition.**