Front Range Industrial Updates: New Moves Ahead!

Front Range Industrial: February 4, 2026 — Only new, verified moves

Institutional‑grade industrial across the Denver MSA (Ft. Collins to Castle Rock): development, acquisitions, leasing/marketing, for‑sale/for‑lease, land, and big‑box/manufacturing.

What’s newly confirmed since Feb 3

  • I‑70/Picadilly DDI commissioning — Aurora now states traffic signals will be turned on and tested “as soon as Wednesday, Feb. 4,” with alternating lane closures on I‑70 Feb. 2–7; oversize/overweight restrictions remain during commissioning and ped/bike access stays closed for now. Expect lane‑closure reductions as final striping begins. (City of Aurora project page and weekly road update, both updated this week). (auroragov.org)

  • Central/infill mid‑box — Prologis Business Center, Building 2 (5025 Florence St.) continues to market ±55,000–133,602 SF. Note the listing page shows “Available Now,” while Prologis’ Denver inventory page shows “Available 3/1/2026.” Treat timing as verify-on-tour. (prologis.com)

  • DIA‑adjacent big‑box — Majestic Commercenter Building 12 is active at 120,000–461,832 SF, cross‑dock, 36' clear, 97 docks, 117 trailer parks; listed “Available: Now.” (loopnet.com)

  • Airport submarket, multi‑tenant — JAG Logistics Center @ DEN (Trade II) continues to market AD‑zoned suites with outside‑storage optionality; current listings refreshed in January show ±4,000–37,180 SF. (loopnet.com)

  • North I‑25 (Thornton) — Rockefeller Group’s 25 Commerce Park confirms one remaining vacancy: Building 1 ±131,250 SF (divisible to ±22K) for sale or lease; project website and CBRE listing both updated this week. (25commerceparkdenver.com)

Fresh transactions and comps to log

  • Portfolio sale (I‑70 infill) — Atcap Partners acquired six northeast‑Denver industrial assets off I‑70 for $47M (recorded Jan 26); DBJ/Bisnow identify streets on 51st Ave., Nome, Moline and Lima. Useful small/mid‑bay infill pricing signal early‑2026. (bisnow.com)

  • Lease — Distribution (Commerce City) — Advance Stores Inc./Advance Auto Parts signed 178,027 SF in Building II at Ascent Commerce Center; 7‑year term; announced Jan 20; building now full. (milehighcre.com)

  • IOS/low‑coverage infill sale — Steel Peak Properties purchased 4600 Monaco St., Denver (2.07 AC with 16,858 SF building) for $3.27M; first CO acquisition for the firm. Pricing marker for central infill/yard uses. (milehighcre.com)

Tour‑ready Class A availabilities (re‑verified today)

Central/infill and DIA‑adjacent

  • Prologis Business Center, Bldg 2 — ±55K–133,602 SF; 30′ clear; 15 docks; 3 DIs; listing shows “Available Now” but cross‑page inventory shows 3/1/2026 availability. Verify on inquiry. (prologis.com)
  • Majestic Commercenter Bldg 12 — 120K–461,832 SF cross‑dock; 36′ clear; 97 docks; 117 trailer parks; “Available Now.” (loopnet.com)
  • JAG Logistics Center @ DEN (Trade II) — AD zoning; suites with outside‑storage options; current posted availability ±4,000–37,180 SF. (loopnet.com)

North I‑25 / NoCo

  • 25 Commerce Park, Bldg 1 (Thornton) — ±131,250 SF for sale/lease; demisable to ±22K; FTZ‑enabled services offered by ownership. (25commerceparkdenver.com)

Park‑scale DIA‑east and southeast Aurora

  • 470 Commerce (Aurora — Newmark) — Phase 1 program totaling ±526K SF (divisible to 30K) promoted with flexible lease/user‑sale/land BTS structures; Phase 2 listings guide initial availabilities around May 2026. (loopnet.com)
  • Denali Logistics Park — Multiple live listings; proposed Bldg 8 at ±1,209,000 SF with pages showing 2026–2027 timing; verify during proposals. Existing building availabilities remain posted across the park. (loopnet.com)

Development watch (big‑box and manufacturing‑capable)

  • I‑70/Picadilly DDI — Commissioning window this week (Feb 2–7 lane closures; signals testing as soon as Feb 4). Expect improved DIA‑east travel times as full activation stabilizes; overweight restrictions remain during transition. (auroragov.org)

  • 470 Commerce (Outer Aurora) — 170‑acre program with Phase 1 (±526K SF) and Phase 2 (±501K SF) publicly marketed; offerings include lease, user sale, land sale and BTS. Listings show initial Phase 2 availability targeted May 2026. (loopnet.com)

  • Denali Logistics Park (Hines/Fulenwider) — Park‑scale plan capable of >3 MSF at full buildout; active marketing includes the ±1.209 MSF “Building 8” concept; cross‑listing timing spans 2026–2027. (loopnet.com)

  • 25 Commerce Park (Rockefeller Group) — Three‑building, 453,550 SF campus; Buildings 2 and 3 leased; Building 1 (131,250 SF) remains the sole vacancy; FTZ‑enabled services noted. (rockefellergroup.com)

Land and IOS notes (Denver MSA to NoCo)

  • IOS benchmark — 4600 Monaco St. (2.07 AC with 16,858 SF) traded for $3.27M mid‑January; fresh signal for yard‑heavy infill uses; reporting via multiple outlets and BusinessDen deal sheet. (milehighcre.com)

  • JAG @ DEN land/BTS pathway — Park marketing continues to advertise customizable BTS sites 5–117 acres with on‑site management and outside storage options. (jagreen.com)

Market snapshot (for underwriting)

  • CBRE Denver Industrial Q4 2025 (published Jan 8, 2026): direct vacancy 7.5% (down 10 bps QoQ); Q4 net absorption +1.0 MSF; full‑year 2025 net absorption +3.6 MSF; Q4 leasing 2.9 MSF; Q4 sales $575M; pipeline ~3.3 MSF. Read‑through: slowing new starts + steady demand imply tightening large‑bay options through 2026. (cbre.com)

Access and infrastructure — plan your routes

  • I‑70/Picadilly DDI commissioning window — Alternating I‑70 lane closures Feb 2–7; signal testing “as soon as Feb. 4”; oversize/overweight restrictions continue; some frontage‑road/Colfax detours still in effect. Expect gradual lane‑closure reduction as final striping proceeds. (auroragov.org)

Quick comp sheet (add to your model)

  • Portfolio sale: Atcap Partners — 6‑building I‑70 infill set; $47M; recorded Jan 26, 2026. (bisnow.com)
  • Lease: Advance Auto Parts — 178,027 SF, Ascent Commerce Center (Commerce City); 7‑year term; announced Jan 20, 2026. (milehighcre.com)
  • IOS/infill sale: 4600 Monaco St., Denver — 2.07 AC + 16,858 SF; $3.27M; buyer Steel Peak; mid‑Jan 2026. (milehighcre.com)

If you want, I can assemble a one‑page PDF with a comp table, current availabilities (specs, contacts), and a DIA‑east map tailored to your shortlist.