# Salix Council Backs Controversial Google Data Center

Newsy: Data Centre & Infrastructure Digest
Published: 2026-11-15T15:00:05.375Z
Source: https://newsyai.com/edition/81811085-0625-4026-a1e3-56edc4cea2ee
Archive: https://newsyai.com/newsy/24c3f9f5-7850-4915-9942-f6be492ab1c1.md

---

**# Intelligence Briefing: Bare-Metal Data Center Market – November 15, 2026**

**Top 3**

**Salix City Council votes 3-2 against a one-year data center moratorium on November 14, allowing a Google-linked project on 900 annexed acres south of Sioux City to advance despite vocal protests and prior postponement due to death threats.**  
One council member switched her vote after Google was identified as the potential customer; the site still requires rezoning and faces a legal challenge from Woodbury County. Primary source: [KIWA Radio](https://kiwaradio.com/news/despite-protests-salix-leaders-vote-to-proceed-with-data-center-project/) (Nov. 15, 2026).  
*Matters because hyperscaler projects moving forward in northwest Iowa sustain regional infrastructure demand while local opposition highlights opportunities for smaller, more community-friendly bare-metal operators.*

**Bare Metal Server Price Index median monthly rate rises to $206.67 (hourly median $0.68) as of November 14, 2026, up from $199.10 earlier in the week.**  
Public list prices across tracked providers show continued strength over the 188-day window. Primary source: [BareMetalIndex.com](https://www.baremetalindex.com/data/) (Nov. 14, 2026).  
*Matters because upward pricing pressure improves margins for independent regional bare-metal providers competing against larger resellers and hyperscalers.*

**Solana Foundation confirms SFDP changes (effective Nov. 6) with a 100-validator cap, 12-month participation limit, and automatic exit at 300,000 SOL external stake; more than 100 validators apply to retain support as the program shifts toward discretionary staking for network contributors.**  
Layer33 open letter requested a pause on retirements; Foundation declined, stating the program “has done its job.” Primary sources: [stakefish](https://blog.stake.fish/news/news-solana-foundation-validator-support-cap-100/) (Nov. 13, 2026) and [Solana Compass](https://solanacompass.com/news/solana-foundations-jacob-creech-says-sfdp-has-done-its-job-as-validator-removals-go-ahead) (Nov. 10, 2026).  
*Matters because tighter validator economics increase demand for cost-effective, reliable dedicated hardware from regional operators serving independent validators.*

## Data Center Industry — New Builds, Expansions, Closures, and M&A in the US; Iowa or Midwest Focus; Capacity and Vacancy Trends; Hyperscaler Expansion Plans

**Aterio’s November 15 update shows Iowa data center pipeline steady at 8,530 MW across 140 projects (141 facilities total), with Google (1,933 MW) and Microsoft (1,706 MW) leading; 64 operational.**  
Linn and Polk counties account for roughly 50% of capacity. Primary source: [Aterio](https://www.aterio.io/insights/us-data-centers/ia) (Nov. 15, 2026).  
*Matters because sustained hyperscaler commitments in central Iowa maintain underlying demand for complementary smaller-footprint or flexible dedicated hosting from regional providers.*

**Sioux County Board of Supervisors approves new data center regulations (4-1 vote) and lifts the county moratorium on November 13, enabling applications under rules including a 25 MW per-site cap, closed-loop cooling requirements, and developer-funded infrastructure improvements.**  
PathOne Data Centers is among those pursuing projects in the county. Primary source: [KIWA Radio](https://kiwaradio.com/news/sioux-county-approves-data-center-rules-votes-to-lift-moratorium/) (Nov. 13, 2026).  
*Matters because structured local rules in northwest Iowa create defined pathways for compliant mid-scale or regional projects over unrestricted hyperscale builds.*

**Nothing significant** on new U.S. builds, expansions, closures, M&A, broader capacity/vacancy trends, or additional hyperscaler plans in Iowa/Midwest beyond the above.

## Bare Metal and Dedicated Hosting Market — Pricing Changes, Renewal Increases, Outages, Acquisitions, or Product Moves

**Bare Metal Server Price Index median monthly rate rises to $206.67 as of November 14 (see Top 3).**  
*Matters because pricing resilience supports margins for independent regional operators competing on dedicated hardware.*

**Servers.com by Nexcess launches Scalable Bare Metal (SBM) service on November 10, offering single-tenant servers billed hourly with no long-term commitment, deployable in as little as 10 minutes, now available in additional U.S. and European metros including Dallas-Fort Worth and Washington, D.C.**  
The service complements the company’s Enterprise Bare Metal for baseline loads. Primary source: [PR Newswire](https://www.prnewswire.com/news-releases/serverscom-by-nexcess-launches-scalable-bare-metal-and-opens-six-new-data-centers-and-pods-in-the-us-and-europe-302934362.html) (Nov. 10, 2026).  
*Matters because new scalable dedicated offerings from established providers add competitive pressure on regional bare-metal operators.*

**Nothing significant** on outages, acquisitions, renewal increases, customer-migration chatter, forum sentiment, or product moves from Latitude.sh, Hetzner, Hivelocity, Cherry Servers, OVHcloud, Equinix Metal, Vultr, or other new entrants.

## Narrative Opportunities — Public or Political Backlash, Cloud Price-Hike Coverage, Cloud-Repatriation Stories, Data Sovereignty Debates, “Big Tech vs. Local Community” Coverage

**Nothing significant** on new public or political backlash, cloud price-hike coverage, repatriation stories, data sovereignty debates, or additional “big tech vs. local community” coverage beyond ongoing local regulatory actions noted above.

## Power and Energy — Grid Capacity Constraints, Power Pricing, Wind and Solar Generation in Iowa and the Midwest, Utility Deals with Data Centers, Energy-Related Permitting Fights

**Nothing significant** on new grid constraints, pricing, renewables, utility deals, or permitting fights in Iowa/Midwest beyond items noted in prior editions.

## GPU and AI Compute Market — Reserved vs. Spot Pricing Shifts, GPU Supply and Availability, Neocloud News, Teams Moving AI Workloads to Dedicated Hardware

**Nothing significant** on reserved vs. spot pricing shifts, GPU supply/availability, neocloud news, or workload migrations to dedicated hardware.

## Blockchain Infrastructure (Brief) — Solana Validator Ecosystem News, Solana Foundation Delegation Program Changes, Validator Hosting and Hardware News, Monad Mainnet Progress

**Solana Foundation SFDP updates continue with more than 100 validators applying to retain support amid the 100-validator cap and 12-month limit (see Top 3).**  
*Matters because tighter economics increase demand for cost-effective, high-reliability dedicated hardware from regional operators serving independent validators.*

**Nothing significant** on additional validator hosting/hardware news or Monad mainnet progress.

## Regulation and Incentives — State Tax Incentives for Data Centers (Iowa Especially), Federal or State Regulation of Data Center Energy Use

**Central City releases draft data center ordinance on November 10 outlining rules for zoning, noise (65 dB limit), water use, electricity demand, emergency response, and site closure; smaller facilities (≤30,000 sq ft) allowed in light- and heavy-industrial zones with site-plan requirements.**  
Larger facilities face additional reviews. Primary source: [KCRG](https://www.kcrg.com/2026/11/10/central-city-releases-draft-ordinance-outlining-rules-proposed-data-center/) (Nov. 10, 2026).  
*Matters because structured local rules in Linn County create defined pathways for compliant smaller-scale or regional projects.*

**Nothing significant** on new Iowa tax incentives or additional state/federal energy-use regulations beyond prior items.

**Sources are primary where possible (trackers, local reporting, operator announcements, and direct regulatory coverage). All items are new or materially updated relative to the November 14 edition.**
