# February Update: Front Range Industrial Insights

Newsy: Denver Industrial Real Estate
Published: 2026-02-09T14:01:00.653Z
Source: https://newsyai.com/edition/6394befc-4f68-44be-96c4-c2edb358aa61
Archive: https://newsyai.com/newsy/a39e5ebf-1943-41e2-b44d-ec38fbcc0415.md

---

# Front Range Industrial: February 9, 2026 — New and decision‑useful only

Institutional‑grade industrial across the Denver MSA (Ft. Collins to Castle Rock): development, acquisitions, leasing/marketing, for‑sale/for‑lease, land, and big‑box/manufacturing. Items below reflect fresh confirmations and meaningful changes since February 8, 2026.

## Access and infrastructure — changes this week to plan around
- I‑70/Picadilly DDI commissioning is advancing: lane striping on I‑70 is scheduled to wrap the week of February 9, 2026, which should reduce intermittent lane closures. A one‑night closure of the WB I‑70 off‑ramp to Tower Rd is slated for Friday, February 13 for sign work. As early as next week, new movements are expected to come online: direct NB/SB Picadilly access to both EB/WB I‑70, restored EB/WB Colfax, new on‑ramp access from Colfax, and the 19th Ave tie‑in. Oversize/overweight restrictions and ped/bike closures remain in place. ([auroragov.org](https://www.auroragov.org/I70picadilly?utm_source=openai))  
- The city’s latest program note reiterates substantial completion of the interchange with finishing work continuing into early 2026, implying intermittent closures will persist. ([auroragov.org](https://www.auroragov.org/news/whats_new/interchange_project_marks_substantial_completion?utm_source=openai))

## Fresh marketing and availabilities (re‑verified today/this week)
- Prologis Business Center, Building 2 (5025 Florence St., Denver — infill): ±55,000–133,602 SF; 30' clear; ESFR; 15 dock‑high; 3 drive‑ins; “Available Now.” Contacts posted for Prologis/CBRE. ([prologis.com](https://www.prologis.com/industrial-properties/building/den00902-prologis-business-center-building-2?utm_source=openai))
- Majestic Commercenter – Building 12 (20600 E 35th Dr., Aurora — cross‑dock big box): active listing shows ±120,000–461,832 SF with 36' clear, 97 docks, 4 drive‑ins, 117 trailer stalls. ([loopnet.com](https://www.loopnet.com/Listing/20600-E-35th-Dr-Aurora-CO/24402535/?utm_source=openai))
- EastPark 70 (Aurora — CBRE): Building 3 (±75,869 SF) and Building 7 (±117,493 SF; divisible to ±32K) both posted as available on the live park site; CBRE detail page for Bldg 7 shows “Delivering Q4‑2025,” For Lease direct. ([eastpark70.cbre-properties.com](https://eastpark70.cbre-properties.com/?utm_source=openai))
- JAG Logistics Center @ DEN – Trade II (Airport District zoning/OZ/EZ/FTZ adjacency): multi‑tenant suites marketed to ±37,180 SF; 30' clear; trailer and auto parking; listing refreshed in January and updated in early February. ([loopnet.com](https://www.loopnet.com/Listing/26122-E-68th-Ave-Aurora-CO/38987811/?utm_source=openai))
- 25 Commerce Park (Thornton/North I‑25 — Rockefeller Group): one remaining vacancy — Building 1 at ±131,250 SF — offered for sale or lease; can demise to ~±18K SF; FTZ‑enabled services. (Buildings 2–3 are reported fully leased.) ([rockefellergroup.com](https://www.rockefellergroup.com/developments/25-commerce-park/))
- 470 Commerce (Outer Aurora — Newmark): Phase 2 marketing live; Bldg 4 ±192,400 SF (divisible to 40K) and Bldg 6 ±126,000 SF (divisible to 30K) posted with initial availability May 1, 2026. Flexible structures: lease, user sale, land sale, BTS. ([loopnet.com](https://www.loopnet.com/Listing/470-Commerce-Bldg-4-Gun-Club-Rd-E-Exposition-Aurora-CO/33846172/?utm_source=openai))

## Development pipeline — what actually moved
- Aero 70 Logistics Park (I‑70 & Aerotropolis Pkwy, Aurora — United Properties/CBRE): site now clearly flags Phase 1 “Under Construction | Delivering Q3 2026” (Bldg 1 ±419,070 SF, 36' clear; Bldg 2 ±398,405 SF, 32' clear). Use Q3 2026 in underwriting unless ownership issues a formal revision. ([aero70.com](https://www.aero70.com/?utm_source=openai))
- Denali Logistics Park (Hines/Fulenwider — DIA‑east): third‑party marketing continues to include a conceptual ±1,209,000 SF “Building 8” alongside existing mid‑box availabilities; collateral varies on notional delivery year (2026–2027). Treat as BTS/proposed and confirm timing at RFP. ([loopnet.com](https://www.loopnet.com/Listing/24251-E-64th-Ave-Aurora-CO/32310558/?utm_source=openai))
- EastPark 70: Bldg 7 remains posted as available on CBRE’s live page while the park overview emphasizes the Picadilly interchange connectivity now being brought online — helpful for routing and drive‑time modeling. ([cbre.com](https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-173032/eastpark-70-building-7-2379-ensenada-street-aurora-co-80011?utm_source=openai))

## Newly logged transactions and comps (past 3 weeks; industrial and IOS)
- I‑70 infill portfolio (NE Denver): Atcap Partners acquired six assets along the I‑70 corridor for $47M (recorded January 26, 2026); addresses include E. 51st Ave., Nome, Moline, and Lima. Current high‑water comp for 2026 infill trades. ([bisnow.com](https://www.bisnow.com/denver/news/industrial/industrial-portfolio-north-of-denver-sells-for-47m-132886?utm_source=openai))
- Single‑tenant big box (Aurora): 18101 E. Colfax Ave. traded for $63.5M in January 2026; buyer entity 18101 East Colfax LLC; local coverage confirms single‑tenant distribution use. ([hoodline.com](https://hoodline.com/2026/01/aurora-colfax-mega-warehouse-goes-for-63-5m-in-cire-equity-power-play/?utm_source=openai))
- Lease — Commerce City: Advance Stores Inc. (Advance Auto Parts) signed 178,027 SF at Ascent Commerce Center Building II (7‑year term); announcement January 20, 2026; building now fully occupied. ([ambrosepg.com](https://ambrosepg.com/ambrose-signs-178000-square-foot-lease-with-advance-stores-inc-at-denver-area-modern-industrial-park/?utm_source=openai))
- IOS/infill — central Denver: 4600 Monaco St. (2.07 AC + 16,858 SF) sold for $3.27M; closed January 2026; early‑year IOS benchmark in core infill. ([businessden.com](https://businessden.com/2026/01/16/the-pipeline-commercial-real-estate-deals-for-1-16-26/?utm_source=openai))
- Northern Colorado sale (Loveland, I‑25): Aardex acquired “Brands West,” two Class‑A buildings totaling 187,457 SF; PR cites January 14, 2026 closing; CoStar reports ~$39.1M (~$209/SF). ([prnewswire.com](https://www.prnewswire.com/news-releases/aardex-acquires-brands-west-a-187-457-square-foot-class-a-industrial-campus-in-loveland-colorado-302660464.html?utm_source=openai))

## Market snapshot — latest figures to anchor underwriting
- CBRE Denver Industrial Figures (Q4 2025; published January 8, 2026): direct vacancy 7.5% (‑10 bps Q/Q); Q4 net absorption +1.0 MSF; full‑year 2025 absorption +3.6 MSF; Q4 leasing 2.9 MSF; Q4 sales $575M; construction pipeline ~3.3 MSF with muted new starts. ([cbre.com](https://www.cbre.com/insights/figures/denver-industrial-figures-q4-2025?utm_source=openai))

## Land and manufacturing‑friendly options to track (North and DIA‑east)
- Centerra/Northern Colorado (Loveland–Johnstown): ongoing industrial campus and flex land/build‑to‑suit pathways; coordinate with ownership teams for latest tract‑level availability. (Program references via McWhinney/Realberry and broker teams; pair with recent Brands West comp above for pricing context.) ([costar.com](https://www.costar.com/article/1880756241/denver-firm-buys-new-two-property-industrial-complex-in-loveland?utm_source=openai))
- Denali Logistics Park: active BTS/large‑format pads including the proposed ±1.209 MSF Building 8; verify entitlements and schedule case‑by‑case. ([loopnet.com](https://www.loopnet.com/Listing/24251-E-64th-Ave-Aurora-CO/32310558/?utm_source=openai))

---

## Quick comp sheet (additions/confirmations since late January)
- Atcap Partners portfolio (NE Denver) — $47,000,000; recorded Jan 26, 2026; I‑70 corridor infill. ([bisnow.com](https://www.bisnow.com/denver/news/industrial/industrial-portfolio-north-of-denver-sells-for-47m-132886?utm_source=openai))
- 18101 E. Colfax (Aurora) — $63,500,000; single‑tenant DC; closed Jan 2026. ([hoodline.com](https://hoodline.com/2026/01/aurora-colfax-mega-warehouse-goes-for-63-5m-in-cire-equity-power-play/?utm_source=openai))
- Advance Auto Parts lease — 178,027 SF, Ascent Commerce Center Bldg II (Commerce City); 7‑year term; posted Jan 20, 2026. ([ambrosepg.com](https://ambrosepg.com/ambrose-signs-178000-square-foot-lease-with-advance-stores-inc-at-denver-area-modern-industrial-park/?utm_source=openai))
- IOS infill — 4600 Monaco St., Denver; 2.07 AC + 16,858 SF; $3,270,000; Jan 2026 close. ([businessden.com](https://businessden.com/2026/01/16/the-pipeline-commercial-real-estate-deals-for-1-16-26/?utm_source=openai))
- NoCo sale — Brands West (Loveland) 187,457 SF; Jan 2026; CoStar reports ~$39.1M (~$209/SF). ([costar.com](https://www.costar.com/article/1880756241/denver-firm-buys-new-two-property-industrial-complex-in-loveland?utm_source=openai))
- User purchase benchmark (late 2025; still pricing‑relevant) — Lovett 76 Logistics Center, Brighton (±613–614K SF cross‑dock): Trader Joe’s acquired for ~$69.35M (Sept 2025). ([bisnow.com](https://www.bisnow.com/denver/news/industrial/trader-joes-buys-brighton-industrial-site-for-69m-131014?utm_source=openai))

---

## Tour‑ready shortlist — institutional Class A, by submarket
- Central/infill and DIA‑adjacent
  - Prologis Business Center Bldg 2 — ±55K–133,602 SF; 30' clear; ESFR; 15 docks; 3 DIs; available now. ([prologis.com](https://www.prologis.com/industrial-properties/building/den00902-prologis-business-center-building-2?utm_source=openai))
  - Majestic Commercenter Bldg 12 — ±120K–461,832 SF; 36' clear; 97 docks; 117 trailer parks; “available now.” ([loopnet.com](https://www.loopnet.com/Listing/20600-E-35th-Dr-Aurora-CO/24402535/?utm_source=openai))
  - JAG Logistics Center @ DEN (Trade II, multi‑tenant) — suites to ±37,180 SF; AD zoning; OZ/EZ/FTZ adjacency; active as of February. ([loopnet.com](https://www.loopnet.com/Listing/26100-26120-E-68th-Ave-Aurora-CO/21121090/?utm_source=openai))
  - EastPark 70 — Bldg 3 (±75,869 SF) and Bldg 7 (±117,493 SF, div. to ±32K) posted/active. ([eastpark70.cbre-properties.com](https://eastpark70.cbre-properties.com/?utm_source=openai))
- North I‑25 / NoCo
  - 25 Commerce Park, Bldg 1 (Thornton) — ±131,250 SF for sale/lease; demisable; FTZ‑enabled services. ([rockefellergroup.com](https://www.rockefellergroup.com/developments/25-commerce-park/))
- DIA‑east and Southeast Aurora (park‑scale)
  - 470 Commerce — Phase 2 availabilities May 1, 2026; divisible ±30K–192K; flexible lease/user sale/land/BTS. ([loopnet.com](https://www.loopnet.com/Listing/470-Commerce-Bldg-4-Gun-Club-Rd-E-Exposition-Aurora-CO/33846172/?utm_source=openai))
  - Aero 70 Logistics Park — Phase 1 under construction; site shows Q3 2026 delivery for two big‑box buildings (±419K and ±398K SF). ([aero70.com](https://www.aero70.com/?utm_source=openai))

---

### Underwriting takeaways this week
- Weight improved DIA access in models beginning the week of February 9 (new movements turning on), but retain allowances for intermittent I‑70 lane restrictions and ongoing oversize/overweight limits through spring 2026. ([auroragov.org](https://www.auroragov.org/I70picadilly?utm_source=openai))
- For large‑format needs, Class A cross‑docks with trailer parking remain scarce; Majestic Bldg 12 and Aero 70 Phase 1 are the cleanest near‑term paths for >350K SF, with Denali’s conceptual Bldg 8 as a BTS lever. ([loopnet.com](https://www.loopnet.com/Listing/20600-E-35th-Dr-Aurora-CO/24402535/?utm_source=openai))
- Q4 2025 data show tightening fundamentals into 2026 despite a light construction pipeline; assume selective landlord concessions but stable face rents on high‑spec assets. ([cbre.com](https://www.cbre.com/insights/figures/denver-industrial-figures-q4-2025?utm_source=openai))

---

Sources  
- City of Aurora — I‑70/Picadilly project updates and traffic impacts. ([auroragov.org](https://www.auroragov.org/I70picadilly?utm_source=openai))  
- Prologis, Majestic Commercenter, CBRE EastPark 70, JAG Logistics, Rockefeller Group 25 Commerce Park, Newmark/LoopNet 470 Commerce — active marketing pages as cited above. ([prologis.com](https://www.prologis.com/industrial-properties/building/den00902-prologis-business-center-building-2?utm_source=openai))  
- Aero 70 official site — schedule/specs. ([aero70.com](https://www.aero70.com/?utm_source=openai))  
- Denali Logistics Park listings — current park- and building‑level availabilities, including proposed Bldg 8. ([loopnet.com](https://www.loopnet.com/Listing/24251-E-64th-Ave-Aurora-CO/32310558/?utm_source=openai))  
- Transactions/Comps — Bisnow, BusinessDen, Ambrose, CoStar. ([bisnow.com](https://www.bisnow.com/denver/news/industrial/industrial-portfolio-north-of-denver-sells-for-47m-132886?utm_source=openai))  
- Market data — CBRE Denver Industrial Figures Q4 2025 (published Jan 8, 2026). ([cbre.com](https://www.cbre.com/insights/figures/denver-industrial-figures-q4-2025?utm_source=openai))

If you want, I can spin this into a one‑page PDF with an updated comp table (addresses, sizes, terms, pricing where posted), a live tour list (broker contacts/links), and a DIA‑east map annotated for the February 9–13 I‑70/Picadilly work window.
