Front Range Industrial Update: What's New This Week!

Front Range Industrial: January 16, 2026 — Only what’s newly confirmed

Institutional‑grade industrial across the Denver MSA (Fort Collins to Castle Rock): development, acquisitions, leasing/marketing, for sale/for lease, land, and big‑box/manufacturing. This edition highlights items posted or re‑verified since yesterday.

What moved since yesterday

  • I‑70/Picadilly Diverging Diamond Interchange — Aurora’s project page (updated this week) continues to show an “early 2026” opening. Alternating lane closures on I‑70 run Jan 12–17; an overnight westbound I‑70 off‑ramp closure to Tower Rd is anticipated the week of Jan 19. Finishing work extends into spring 2026; Picadilly Rd between E. 19th Ave and Smith Rd remains closed until early 2026. Expect minor routing variability for DIA‑east tours until full activation. (auroragov.org)

  • Market figures — CBRE’s Q4 2025 Industrial Figures (published Jan 8) remain the latest: direct vacancy 7.5% (−10 bps QoQ), Q4 net absorption +1.0 MSF (2025 total +3.6 MSF), pipeline ~3.3 MSF, Q4 leasing 2.9 MSF, Q4 sales $575M; owner‑user sales hit a record annual high. (cbre.com)

Fresh capital markets and comps

  • Loveland (NoCo) sale comp — Aardex closed on Brands West, a fully leased, two‑building Class A campus totaling 187,457 SF at 5365 Byrd Dr. and 5645 Kitty Hawk Dr., acquired from Hines (posted Jan 14). Tenant mix skews advanced manufacturing/assembly; 28'–32' clear, 49 docks, 43 trailer stalls. Useful price‑ and yield‑discovery comp for modern NoCo industrial. (milehighcre.com)

  • Central Denver infill portfolio (context) — 1.6 MSF, 16‑building sale to Harrison Properties (largest CO industrial trade since 2022) remains a key benchmark for infill small‑bay pricing. (cbre.com)

Newly re‑verified development and major availabilities

  • Aero 70 (United Properties/CBRE), I‑70 & Aerotropolis Pkwy, Aurora — Site updated this week: Phase 1 “Now Under Construction | Delivering Q1 2026.” Bldg 1: 419,070 SF (36' CH), 74 docks; Bldg 2: 398,405 SF (32' CH), 99 docks; heavy power (4,000A, expandable), ample trailer parking. Over 204 acres remain for BTS/land. (aero70.com)

  • 470 Commerce (Aurora, Gun Club Rd & E Exposition) — Active program with flexible structures (lease, user sale, land sale, BTS). LoopNet shows Phase 1 three‑building program totaling ±526,000 SF; example: Bldg 1 (141,200 SF, 32' clear; for sale/user or lease), Bldg 4 (192,400 SF), Bldg 6 (126,000 SF). Current posts reflect 2026 availability timing. (loopnet.com)

  • EastPark 70, Building 7 (CIG/CBRE), 2379 Ensenada St., Aurora — Listing updated this week; 117,493 SF, 32' clear; delivery Q4 2025; divisible to ±30K; outside storage approved by zoning. (cbre.com)

  • First Aurora Commerce Center (First Industrial/CBRE), 22600 E 26th Ave., Aurora — Park page re‑verified: options to ±1,290,361 SF across Bldg E (588,085 SF), Bldg H (440,000 SF), and two ±131K mid‑boxes; ±10‑month builds. (cbre.com)

  • Prologis Business Center, Building 2 (Central Park) — Availability re‑verified: 55K–133,602 SF, 30' clear; Prologis page currently shows “Available Now” (some directory pages still show 3/1/2026; use the building page for the most current timing). (prologis.com)

  • Central infill — Active and tour‑ready:

    • Downtown Distribution Center (single‑tenant), 5601 Franklin St., Denver — ±134,368 SF; infill with unincorporated Adams County tax advantage; listing refreshed Jan 9–15. (cushmanwakefield.com)
    • Broadway Logistics Center (Lovett), 6795 Broadway, Denver — up to ±145,746 SF contiguous in a 201,329 SF, 32' clear building; marketing refreshed this month. (cushmanwakefield.com)
    • 5950 Washington St., Denver — ±97,336 SF, 32' clear; divisible to ±24,333 SF; updated this week. (cushmanwakefield.com)
  • Picadilly Crossing (Brennan/Stream), 21051 & 21201 E 6th Ave., Aurora — Stream’s leasing/management assignment confirmed Nov 10; two buildings totaling ±513K SF; demisable to ±40K; sale or lease; positioned to benefit from DDI opening. LoopNet notes substantial construction and early‑2026 completion. (milehighcre.com)

Newly confirmed/verified lease markers (context)

  • Manufacturing: Pretred Inc., 152,034 SF, 10‑year lease at Denali Logistics Park; move‑in targeted May 2026 after TIs. (milehighcre.com)

  • DIA‑east: PMI/ZYN, ±150,000 SF at Sun Empire in Aurora (adjacent to planned factory); continues to set mid‑box demand signals. (businessden.com)

Active land and big‑box pathways to fill 2026 demand

  • Aero 70 (future phases and raw land options) and First Aurora Commerce Center offer credible BTS and trailer‑heavy solutions as big‑box supply stays thin into 2026. (aero70.com)

  • 470 Commerce shows flexible land‑sale and user‑sale structures in addition to multi‑building lease offerings; monitor for spring marketing updates. (loopnet.com)

Fresh sale/lease/land comparables (selected; newest first)

  • Brands West (Loveland) — Two‑building Class A campus, 187,457 SF; buyer: Aardex; seller: Hines; 100% leased at close. Posted Jan 14, 2026. (milehighcre.com)

  • Central Denver Infill Portfolio — 1.6 MSF (16 buildings) sold to Harrison Properties, Oct 21, 2025; largest CO industrial trade since 2022. (cbre.com)

  • Denali Logistics Park lease — Pretred Inc., 152,034 SF, 10‑year term; move‑in May 2026. (milehighcre.com)

  • Sun Empire lease — PMI/ZYN, ±150,000 SF, DIA‑east; 2025 benchmark for expansion staging near planned manufacturing. (businessden.com)

Quick tour list (pages re‑verified Jan 15–16 unless noted)

  1. Prologis Business Center Bldg 2 — 55K–133,602 SF, 30' clear, central infill. (prologis.com)
  2. Downtown Distribution Center — 134,368 SF single‑tenant, infill/low‑tax. (cushmanwakefield.com)
  3. Broadway Logistics Center — up to 145,746 SF contiguous, 32' clear. (cushmanwakefield.com)
  4. 5950 Washington St. — 97,336 SF; divisible to ±24,333 SF. (cushmanwakefield.com)
  5. EastPark 70 Bldg 7 — 117,493 SF; Q4 2025 delivery (CBRE timeline). (cbre.com)
  6. First Aurora Commerce Center — paths from ~100K to 588K+; ±10‑month builds. (cbre.com)
  7. Aero 70 Phase 1 — 419K/398K SF cross‑docks; Q1 2026 delivery. (aero70.com)
  8. 470 Commerce (Phase 1) — 141K/192K/126K SF; user sale/lease and land sale options. (loopnet.com)
  9. Picadilly Crossing — two buildings totaling ±513K SF; for sale or lease; early‑2026 completion. (milehighcre.com)

Underwriting snapshot (as of Jan 16, 2026)

  • Vacancy 7.5%; 2025 net absorption +3.6 MSF; pipeline ~3.3 MSF; Q4 leasing 2.9 MSF; sales $575M. Limited new speculative starts and the DDI nearing activation should keep DIA‑adjacent big‑box and true central infill relatively tight through 2026. (cbre.com)

Sources

  • City of Aurora: I‑70/Picadilly project page and weekly lane/ramp updates; road construction notices. (auroragov.org)
  • CBRE Q4 2025 Denver Industrial Figures (Jan 8, 2026). (cbre.com)
  • Property/park listings and updates: Aero 70; EastPark 70; First Aurora Commerce Center; Prologis (Business Center Bldg 2); Downtown Distribution Center; Broadway Logistics Center; 5950 Washington; Picadilly Crossing. (aero70.com)
  • Capital markets and leases: Mile High CRE, CBRE press, BusinessDen. (milehighcre.com)

Need a full comp matrix with ask/term guidance (NNN, TI/concessions), power/trailer ratios, and recent deal points? The above pages can be compiled into a side‑by‑side workbook upon request.