Front Range Industrial Insights: December Update
Front Range Industrial: December 20, 2025 — Fresh, decision‑grade intel
Institutional‑grade industrial across the Denver MSA (Fort Collins to Castle Rock). Development, acquisitions, leasing/marketing, for sale/for lease, land, and big‑box/manufacturing updates.
What’s new since Dec 19
- I‑70/Picadilly DDI opening window still “by late December,” with cutover staging and intermittent closures into early/spring 2026. Keep buffer time on DIA‑east tours during activation. (auroragov.org)
- CBRE refreshed Aurora Commerce Center marketing: 66K–173K SF, March 2025 delivery, EZ/OZ; messaging highlights adjacency to the Picadilly interchange. (cbre.com)
Development and infrastructure tracker
- I‑70/Picadilly Diverging Diamond Interchange (DDI) — Substantial completion marked; opening to travelers targeted “by late December,” weather‑permitting. Expect lane shifts/closures during cutover; finishing work into spring 2026. (auroragov.org)
- EastPark 70 (CIG/CBRE) — Building 7: 117,493 SF front‑park/front‑load under construction; Q4 2025 delivery; Aurora I‑1 with OS permitted. (eastpark70.cbre-properties.com)
- Picadilly Crossing (Brennan x Stream) — Two buildings totaling ±513K SF, for sale/lease, aligned to DDI timing (program previously announced; leasing/management active). (milehighcre.com)
- DIA logistics positioning — Amazon’s 625K SF DIA Logistics Park purchase plus trailer lot land continues to validate airport‑area land and trailer premiums. (businessden.com)
Fresh, tour‑ready Class A/institutional availabilities
Central infill
- Broadway Logistics Center — up to 145,746 SF; 32' clear; 46 docks; ~50 trailer stalls; immediate. (loopnet.com)
- Downtown Distribution Center — 134,368 SF; 32' clear; divisible to ±34,880 SF; EZ tax benefits; active marketing. (cushmanwakefield.com)
- Pivot Denver – Building 4 — 86,047 SF; 32’ clear; 18 DH/3 DI; immediate. (cushmanwakefield.com)
- 5950 Washington St. — 97,336 SF; 32’ clear; 10 DH/2 DI; divisible; new construction. (cushmanwakefield.com)
DIA / I‑70 East corridor
- Aurora Commerce Center — 66K–173K SF; March 2025; EZ/OZ; trailer parking; spec suite. (cbre.com)
- EastPark 70 – Building 7 — 117,493 SF; Q4 2025; OS permitted; front‑load. (eastpark70.cbre-properties.com)
2026+ big‑box pipeline for early penciling
- Aero 70 — Phase 1 ±817.5K SF across two cross‑docks; 2026 cadence (tracking alongside DIA‑area momentum). (businessden.com)
- Picadilly Crossing — ±513K SF total; for sale/lease; Q4 2026 guide. (milehighcre.com)
New and notable comps (lease/sale/land)
- Lease — 72,735 SF distribution (Aurora/DIA corridor): GOFO/US Elogistics at 19100 E. 38th Ave., Bldg 26; 36' clear, 22 docks, 43 trailer stalls. Useful mid‑box pricing/terms comp for Airport submarket. (businessden.com)
- Lease — 152,034 SF manufacturing (Aurora): Pretred Inc. at Denali Logistics Park; 10‑year term; power‑intensive spec confirmed; move‑in after TI (target early May 2026). (milehighcre.com)
- Lease — 150,000 SF distribution (Aurora/DIA): Philip Morris International at Sun Empire; confirms airport‑adjacent momentum; outsized residual big‑box need remains in submarket. (milehighcre.com)
- Lease — 91,744 SF distribution (Aurora/Majestic): Novelty Lights relocation into DIA market; mid‑box benchmark. (milehighcre.com)
- Lease — 80,809 SF crane‑served (Fort Collins): Black Label Services at 120 NE Frontage Rd; 3×10‑ton + 7×3‑ton cranes; ±3.85 AC OS; regional heavy‑industrial comp. (cushmanwakefield.com)
- Sale (portfolio, infill) — 1.6 MSF shallow‑/small‑bay Central Denver to Harrison Properties; largest CO industrial trade since 2022. (cbre.com)
- Sale (user big‑box) — Lovett 76 Logistics Center (±614K SF) to Trader Joe’s for ~$69.4M; cold‑capable retrofit planned; sets big‑box user pricing bar. (bisnow.com)
- Sale (DIA‑adjacent user + land) — Amazon’s 625K SF acquisition near DIA plus follow‑on 13‑acre trailer lot; underscores trailer/yard premium. (businessden.com)
- Capital markets — Denali Logistics Park refinanced with a $71M, 3‑year, I/O bank loan (future funding for lease‑up); signals lender conviction in DIA‑east Class A. (milehighcre.com)
Market context and metrics to underwrite
- Denver Industrial Q3 2025: availability ~10%; pipeline near multi‑year lows, supporting rent stability into 2026, with DIA‑east and central infill leading activity. (Portfolio‑sale release and submarket commentary) (cbre.com)
- Central/infill and Airport submarkets continue to price yards/trailer positions at a premium; near‑term DDI opening should compress truck times on I‑70 East. (auroragov.org)
Quick, add‑to‑tour short‑list (verified/updated)
- Broadway Logistics Center — up to 145,746 SF; 32' clear; 46 docks; ~50 trailer stalls; immediate. (loopnet.com)
- Downtown Distribution Center — 134,368 SF; 32' clear; EZ tax; divisible. (cushmanwakefield.com)
- EastPark 70 – Building 7 — 117,493 SF; Q4 2025; OS permitted. (eastpark70.cbre-properties.com)
- Aurora Commerce Center — 66K–173K SF; March 2025; EZ/OZ; trailer parking. (cbre.com)
- Pivot Denver – Building 4 — 86,047 SF central infill; 32' clear; 18 DH/3 DI. (cushmanwakefield.com)
- 5950 Washington St. — 97,336 SF freestanding; 32’ clear; 10 DH; divisible to ~24K. (cushmanwakefield.com)
Callout: As the DDI activation window narrows, re‑price yards/trailer positions and re‑run dray/time‑savings models for Airport‑adjacent assets (e.g., Aurora Commerce Center, EastPark 70 Bldg 7). Expect intermittent traffic control during cutover and punch‑list work into spring 2026. (auroragov.org)
Northern Colorado watch
- Heavy‑industrial/OS comp: Black Label Services’ 80,809 SF crane‑served lease (Fort Collins) remains the go‑to underwriting benchmark for crane/power/yard along I‑25; additional small‑bay development at I‑25/Prospect is being marketed at ±$350/SF. (cushmanwakefield.com)
If helpful, I can compile today’s properties and comps into a broker‑verified matrix (clear height, loading, trailer/yard, power/crane, divisibility, OS rights, tax/zone, ask/TI/concessions) and a live comp sheet aligned to your size, power, OS/crane, and submarket filters.