# Fresh Insights: Denver Industrial Market Update

Newsy: Denver Industrial Real Estate
Published: 2026-01-09T14:00:00.602Z
Source: https://newsyai.com/edition/42b9fdb8-de31-47dd-a60e-6b41e6619b83
Archive: https://newsyai.com/newsy/a39e5ebf-1943-41e2-b44d-ec38fbcc0415.md

---

# Front Range Industrial: January 9, 2026 — Only what’s newly confirmed

Institutional‑grade industrial across the Denver MSA (Fort Collins to Castle Rock): development, acquisitions, leasing/marketing, for sale/for lease, land, and the “big‑box/manufacturing” umbrella. This edition flags items that moved or were freshly re‑verified since January 8, 2026, and adds any new lease/sale/land comps confirmed today.

## What’s new or freshly verified (Jan 9)

- CBRE releases Q4 2025 Denver Industrial Figures (dated Jan 8, 2026)  
Direct vacancy ticked down to 7.5% in Q4; quarterly net absorption was +1.0 MSF, bringing 2025 to +3.6 MSF (up 32.8% YoY). Construction pipeline held at 3.3 MSF with starts slowing; Q4 leasing hit 2.9 MSF and sales totaled $575M. Owner‑user activity remained exceptionally strong. Source: https://www.cbre.com/insights/figures/denver-industrial-figures-q4-2025

- I‑70/Picadilly DDI status — still “projected for early January” full opening  
City pages updated this week continue to show “early January, weather‑permitting” for full activation, with finishing work and traffic changes through spring 2026. Colfax detour for EB I‑70 access remains in place. No city notice yet that the DDI is fully live.  
Sources:  
• Project page: https://www.auroragov.org/I70picadilly  
• Road Construction Updates (updated this week): https://www.auroragov.org/news/whats_new/road_construction_updates  
• Colfax detour explainer: https://www.auroragov.org/news/whats_new/colfax_detour_in_place_for_eastbound_i-70_access

- Aero 70 marketing re‑checked today — Phase 1 unchanged  
Two cross‑docks totaling 817,475 SF remain “Now Under Construction | Delivering Q1 2026” (Bldg 1: 419,070 SF, 36' clear; Bldg 2: 398,405 SF, 32' clear). Source: https://www.aero70.com/

- EastPark 70 — Building 7 page reconfirms Q4 2025 delivery and specs  
±117,493 SF under construction; 32' clear; 29 dock‑high, 2 DI; divisible to ~30K SF. Source: https://eastpark70.cbre-properties.com/

- Central infill confirmations (tour‑ready)  
Broadway Logistics Center (up to ±145,746 SF available in a 201,329‑SF 2024 Class A), Downtown Distribution Center (±134,6K SF, low Adams County sales/use tax), and 5950 Washington St (±97,336 SF, 32' clear, divisible) all remain actively marketed as of today.  
Sources:  
• Broadway: https://www.broadwaylogisticscenter.com/  
• Downtown Distribution Center site: https://www.downtowndistributionden.com/  
• 5950 Washington: https://www.5950washingtonstreet.com/

- First Aurora Commerce Center and Aurora Commerce Center — marketing live  
First Aurora Commerce Center remains a 138‑acre, BTS‑capable park to ±1,290,361 SF (Buildings E 588K; H 440K; A/B 131K each; 10‑month build timeline). Aurora Commerce Center keeps its near‑term availability window (±66K–173K SF; March 2025; EZ/OZ positioning).  
Sources:  
• First Aurora Commerce Center site: https://first-aurora-commerce-center.cbre-properties.com/  
• CBRE listing: https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-121446/first-aurora-commerce-center-22600-east-26th-avenue-aurora-co-80019  
• Aurora Commerce Center listing: https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-174072/aurora-commerce-center-22100-east-26th-avenue-aurora-co-80019

## Active development and pipeline check (freshly reconfirmed)

1) DIA‑east big‑box/spec  
- Aero 70 (United Properties/CBRE) — Phase 1 under construction; Q1 2026 delivery. https://www.aero70.com/  
- 470 Commerce (Aurora/Newmark) — Phase 1 program marketed at 526K SF with divisibility to 30K; flexible lease/user sale/BTS/land. https://www.loopnet.com/Listing/470-Commerce-Bldg-1-Gun-Club-Rd-E-Exposition-Aurora-CO/34081804/  
- Picadilly Crossing (Brennan/Stream) — Two buildings totaling ~513K SF for sale/lease; Stream retained for leasing/management; ground‑breaking posts target Q4 2026 completion. https://milehighcre.com/stream-realty-partners-awarded-leasing-and-management-for-picadilly-crossing/  
- EastPark 70 – Building 7 (CIG/CBRE) — 117,493 SF under construction; Q4 2025. https://eastpark70.cbre-properties.com/

2) Central/infill Class A options  
- Broadway Logistics Center (Lovett/C&W) — Up to ±145,746 SF contiguous remaining. https://www.broadwaylogisticscenter.com/  
- Downtown Distribution Center (ViaWest/C&W) — ±134,6K SF; unincorporated Adams Co. tax advantage. https://www.downtowndistributionden.com/  
- 5950 Washington St (C&W) — ±97,336 SF; divisible to ±24,333 SF; 32' clear. https://www.5950washingtonstreet.com/

3) Planned/user‑driven parks  
- First Aurora Commerce Center (First Industrial/CBRE) — Park scale to ±1.29 MSF; buildings can deliver in ~10 months once green‑lit. https://first-aurora-commerce-center.cbre-properties.com/

4) Access/infrastructure watch (for underwriting and travel times)  
- I‑70/Picadilly DDI — full opening still “projected for early January”; site work and traffic changes continue through spring 2026; EB Colfax detour remains active.  
Sources: Project page and road updates linked above.

## New data points you can use in underwriting (as of Jan 9)

- Market momentum into year‑end 2025  
CBRE’s Q4 2025 release (Jan 8, 2026) shows: direct vacancy 7.5% (down 10 bps QoQ); 2025 net absorption +3.6 MSF; pipeline 3.3 MSF; quarterly leasing 2.9 MSF; Q4 sales $575M. This supports the “selectively tightening” narrative for quality product in 2026, especially as 2026 new starts remain muted. Source: https://www.cbre.com/insights/figures/denver-industrial-figures-q4-2025

- Construction timing remains the gating factor east of E‑470  
Aero 70 Phase 1 (Q1 2026) and Picadilly Crossing (targeting late‑2026) keep near‑airport big‑box supply thin until deliveries hit; First Aurora Commerce Center can accelerate with BTS/user triggers.  
Sources: https://www.aero70.com/ ; https://milehighcre.com/stream-realty-partners-awarded-leasing-and-management-for-picadilly-crossing/ ; https://first-aurora-commerce-center.cbre-properties.com/

## Latest deals and comps added or reconfirmed

Leases (distribution/manufacturing and big‑box relevant)  
- GOFO/US Elogistics — 72,735 SF at 19100 E. 38th Ave., Aurora (posted Dec 5, 2025). Benchmark mid‑box comp in DIA corridor. https://businessden.com/2025/12/05/the-pipeline-commercial-real-estate-deals-for-12-5-25/  
- Pretred Inc. — 152,034 SF, 10‑year lease at Denali Logistics Park; occupancy targeted for May 2026 after TIs. https://milehighcre.com/avison-young-negotiates-152034-sf-industrial-lease-in-denver/ ; CREJ clip: https://etypeproductionstorage1.blob.core.windows.net/%24web/Production_Prod/Jobs/702/2025-11-13/494028/FlippingBook/Colorado-Real-Estate-Journal_494028/index.html  
- Philip Morris International (ZYN) — 150,000 SF at Sun Empire (Aurora); adjacent to planned $600M plant. Posted Aug 26, 2025; still the latest named big user in Airport submarket. https://businessden.com/2025/08/26/zyn-parent-leases-warehouse-next-to-planned-600m-aurora-factory/  
- Novelty Lights — 91,744 SF at Majestic Commercenter (late Sep 2025). https://milehighcre.com/mile-high-transactions-report-week-ending-09-26-25/

Northern Colorado manufacturing/craned  
- Black Label Services — 80,809 SF at 120 NE Frontage Rd., Fort Collins; crane‑served; long‑term lease. https://www.cushmanwakefield.com/en/united-states/news/2025/07/arranges-new-lease-at-120-ne-frontage-road-in-fort-collins ; https://www.rentv.com/content/homepage/etcetc/news/33064

Sales and capital markets  
- Central Denver Infill Portfolio — 1.6 MSF (16 buildings) sold to Harrison Properties; still the largest Colorado industrial trade since 2022. https://milehighcre.com/16-building-industrial-portfolio-sells-to-phoenix-based-buyer/ ; https://www.cbre.com/press-releases/cbre-arranges-sale-of-1-6-million-sf-16-building-industrial-portfolio  
- Trader Joe’s user sale — 613,758 SF at Lovett 76 Logistics Center (Brighton) for $69.4M; cold‑capable retrofit context. https://www.bisnow.com/denver/news/industrial/trader-joes-buys-brighton-industrial-site-for-69m-131014

Capital stack/financing  
- Denali Logistics Park (Hines) — $71M refinance to replace construction debt and fund lease‑up. https://milehighcre.com/essex-sources-71m-loan-for-hines-denali-logistics-park/ ; https://rebusinessonline.com/essex-arranges-71m-refinancing-for-denali-logistics-park-in-aurora-colorado/

Industrial outdoor storage (IOS)  
- Alterra IOS Denver‑area acquisitions (incl. Brighton) — mid‑Dec 2025 postings remain the latest public markers. https://www.bisnow.com/denver/news/deal-sheet/alterra-ios-buys-denver-area-outdoor-storage-sites-the-denver-deal-sheet-132206 ; https://news.ioslist.com/p/december-15-kenai-capital-sells-denver-colorado-ios-alterra ; https://news.ioslist.com/p/december-12-unique-properties-sells-denver-colorado-ios-westlake-buys-sacramento-ios

## Tour‑ready shortlist for the next two weeks (central infill + DIA/I‑70 corridors)

- Broadway Logistics Center — up to ±145,746 SF contiguous in a 2024‑delivered Class A asset; low mill levy; central labor access. https://www.broadwaylogisticscenter.com/  
- Downtown Distribution Center — single‑tenant ±134,6K SF with tax advantages. https://www.downtowndistributionden.com/  
- 5950 Washington St — ±97,336 SF; divisible; 32' clear; EZ incentives. https://www.5950washingtonstreet.com/  
- EastPark 70 – Building 7 — 117,493 SF delivering Q4 2025; front‑load; 32' clear. https://eastpark70.cbre-properties.com/  
- Aurora Commerce Center — ±66K–173K SF; March 2025 timing; EZ/OZ. https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-174072/aurora-commerce-center-22100-east-26th-avenue-aurora-co-80019

## Land and NoCo spotlight (institutionally relevant)

- Centerra Industrial Land (Loveland) — multi‑parcel campus with BTS/lease land paths up to ~5.9 MSF potential; useful for regional hub modeling. https://www.cbre.com/properties/properties-for-lease/land/details/US-SMPL-30500/centerra-industrial-land-loveland-co-80538

## Quick takeaways for underwriting and timing (as of Jan 9)

- 2025 finished on solid footing: vacancy eased to 7.5% and annual absorption accelerated; new starts remain muted, implying a tighter 2026 backdrop for well‑located Class A assets. Source: https://www.cbre.com/insights/figures/denver-industrial-figures-q4-2025  
- DIA‑east access is close to improving, but minor travel friction will linger until the I‑70/Picadilly DDI is fully opened and finishing work concludes (spring 2026). Sources: https://www.auroragov.org/I70picadilly ; https://www.auroragov.org/news/whats_new/road_construction_updates

---

If you want, I can deliver a broker‑verified matrix (clear heights, docks/DI, trailer counts, yard/OS entitlements, power/cranes, tax/zoning, asking/TI/concessions) and a refreshed comp book with DIA and labor‑shed drive‑times.
