# September Surge: Bare Metal Server Prices Drop!

Newsy: Data Centre & Infrastructure Digest
Published: 2026-09-25T14:00:01.017Z
Source: https://newsyai.com/edition/2ecbd3bf-4ddd-486f-8518-1ebe0fca8f1d
Archive: https://newsyai.com/newsy/24c3f9f5-7850-4915-9942-f6be492ab1c1.md

---

**Intelligence Briefing: Bare-Metal Data Center Market Intelligence**  
**Date: September 25, 2026**

### Top 3 Items You’d Be Foolish to Miss

1. **Bare Metal Server Price Index median monthly plan falls sharply to $134.75 on September 25, 2026 (down from $151.80 the prior day; median hourly remains $0.65).**  
   The index aggregates public list prices across ~583–590 plans from eight providers. Monthly plans range $4.35–$46,720; hourly $0.01–$68.00. This marks a notable single-day softening within the longer-term downward trend.[[1]](https://www.baremetalindex.com/data/)[[1]](https://www.baremetalindex.com/data/)  
   **Date:** September 25, 2026 (daily update)  
   **Primary source:** baremetalindex.com/data/  
   **Why it matters:** Continued list-price erosion strengthens the case for cost-sensitive regional bare-metal alternatives versus national dedicated or hyperscale options amid fluctuating demand.

2. **Salix, Iowa City Council votes 3-2 on September 25, 2026, against enacting a one-year data center moratorium despite vocal protests and prior threats.**  
   The council rejected the moratorium proposal, allowing potential progress on a 900-acre site annexed earlier for a possible Google/MidAmerican Energy project (still needing rezoning). A council member switched votes after Google was identified as a potential customer; the city faces a separate legal challenge from Woodbury County over the annexation.[[2]](https://kiwaradio.com/news/despite-protests-salix-leaders-vote-to-proceed-with-data-center-project/)  
   **Date:** September 25, 2026  
   **Primary source:** kiwaradio.com  
   **Why it matters:** Local political outcomes in northwest Iowa can signal shifting community or council tolerance for large projects, creating differentiation opportunities for smaller, lower-profile regional operators.

3. **Solana’s Alpenglow consensus upgrade goes live on public testnet on September 24, 2026, replacing TowerBFT with Votor for ~150 ms finality.**  
   Anza activated the feature gate; validators must run Agave 4.3. Firedancer/Frankendancer clients do not yet support it. Mainnet target remains around September 28 or October 2026.[[3]](https://solanacompass.com/news/alpenglow-is-live-on-solana-testnet-as-anza-retires-towerbft-and-votor-takes)[[4]](https://www.tokenpost.com/news/technology/23970)  
   **Date:** September 24, 2026  
   **Primary source:** solanacompass.com (and related developer reports)  
   **Why it matters:** Faster finality and off-chain voting changes validator hardware, uptime, and economics—relevant for any Solana validator hosting offerings or infrastructure decisions.

### Data Center Industry
**Nothing significant** on new U.S. builds, expansions, closures, M&A, Iowa/Midwest hyperscaler facilities, or capacity/vacancy trends on September 25 (beyond the Salix local vote detailed in Top 3).

### Bare Metal and Dedicated Hosting Market
**Bare Metal Server Price Index** updated September 25 (detailed in Top 3).[[1]](https://www.baremetalindex.com/data/)

**Nothing significant** on new pricing changes, outages, acquisitions, product moves, or customer-migration chatter from Latitude.sh, Hetzner, Hivelocity, Cherry Servers, OVHcloud, Equinix, Vultr, or new entrants on September 25.

### Narrative Opportunities
**Nothing significant** on additional public/political backlash, cloud price-hike coverage, repatriation stories, data sovereignty debates, or “big tech vs local community” reporting beyond the Salix council vote on September 25.

### Power and Energy
**Nothing significant** on new grid capacity constraints, power pricing, wind/solar generation, utility deals, or additional energy-related permitting fights in Iowa or the Midwest on September 25 (ongoing Alliant scrutiny noted in prior editions without material new developments today).

### GPU and AI Compute Market
**Nothing significant** on reserved vs. spot pricing shifts, GPU supply/availability, neocloud news, or AI workload migrations to dedicated hardware on September 25.

### Blockchain Infrastructure (Brief)
**Solana Alpenglow upgrade enters public testnet** (detailed in Top 3).[[3]](https://solanacompass.com/news/alpenglow-is-live-on-solana-testnet-as-anza-retires-towerbft-and-votor-takes)

**Nothing significant** on Solana Foundation Delegation Program changes, validator hosting/hardware news, or Monad mainnet progress on September 25.

### Regulation and Incentives
**Nothing significant** on new state tax incentives (Iowa unchanged) or federal/state energy-use regulations on September 25.

**Sources are linked inline above for easy verification.** All items derive from primary or direct reporting; no speculation or aggregator summaries used.
