Front Range Industrial Update: December Insights

Front Range Industrial: December 29, 2025 — Fresh, decision‑grade updates

Institutional‑grade industrial across the Denver MSA (Fort Collins to Castle Rock): development, acquisitions, leasing/marketing, for sale/for lease, land, and big‑box/manufacturing. Only new or newly verified items since December 28, 2025.

What changed today

  • I‑70/Picadilly DDI: City of Aurora pages still show “late‑December opening,” with holiday detours and intermittent lane closures; no “interchange is live” notice posted as of December 29. Plan for continued traffic pattern changes and finishing work into spring 2026. (auroragov.org)

Sources (full URLs)


Fresh/verified marketing updates (institutional, tour‑ready)

  • Aurora Commerce Center (CBRE) — page live and current; ±66,000–173,148 SF; “Available March 2025”; notes Enterprise and Opportunity Zone adjacency and proximity to the Picadilly DDI. Good DIA‑east mid‑box option while big‑box remains tight. (cbre.com)

  • Picadilly Crossing (Brennan/Stream) — Stream’s November 10 assignment stands; two buildings totaling ±513,000 SF for lease or sale; Aurora location positioned to benefit from DDI activation. (streamrealty.com)

Sources (full URLs)


New/meaningful deals and comps you can underwrite now

Leases (Denver MSA + NoCo, late‑2025 confirmations)

  • GOFO/US Elogistics — 72,735 SF at 19100 E. 38th Ave., Aurora (DIA corridor mid‑box). (businessden.com)
  • Pretred Inc. — 152,034 SF, Denali Logistics Park (10‑year; heavy‑power TI; early‑May 2026 move‑in). Manufacturing skew. (milehighcre.com)
  • Novelty Lights — 91,744 SF at 3700 N. Windsor Dr., Aurora (Majestic Commercenter). Distribution relocation to DIA corridor. (milehighcre.com)
  • NoCo benchmark — Black Label Services, 80,809 SF crane‑served lease, 120 NE Frontage Rd., Fort Collins. Manufacturing/overhead crane capability. (cushmanwakefield.com)

Sales and capital markets (institutional signal)

  • Central Denver infill portfolio — 1.6 MSF (16 buildings) sold to Harrison Properties; largest CO industrial trade since 2022. (milehighcre.com)
  • Innovate 25 (Thornton) presale — Posiflex acquired 108K SF Building 3 for $19.5M; Stream/Brennan program; validates North I‑25 investor/user demand. (bisnow.com)
  • Aurora single‑tenant — Koll Company bought 142K SF RK Mission Critical building (17450 E. 32nd Pl.) for $15.8M; long‑term tenancy through 2029. (connectcre.com)
  • 25 North refinance (Thornton) — JLL placed $99.3M debt on 936,775 SF nine‑building Class A campus; comps useful for pricing/credit tone in North I‑25. (jll.com)

Amazon near DIA (land/building positioning)

  • Amazon’s DIA Logistics Park aggregation (Aurora/Adams County) — 625K SF building buy plus adjacent land in late 2024; added ~13 acres in late 2024/Jan 2025; confirms airport‑adjacent trailer/yard premium and long‑haul cross‑dock strategy. Useful as a land pricing and trailer parking comp. (businessden.com)

Sources (full URLs)


Regional manufacturing watch (impacting Front Range logistics)

  • Swire Coca‑Cola to build a 620K SF, $475M plant at Peak Innovation Park (Colorado Springs Airport); construction to start in 2026, replacing an aging Denver facility. Expect incremental manufacturing/logistics hiring and supply‑chain shifts that could free/repurpose legacy Denver production space and add south‑corridor trucking demand. (bisnow.com)

Source (full URL)


Development/construction tracker (big‑box and programmatic)

  • Picadilly Crossing (Brennan/Stream) — ±513K SF across two Class A buildings; for sale/lease; Q4 2026 delivery target; marketing active. (streamrealty.com)
  • Aero 70 (United Properties) — Phase 1 under construction (two cross‑docks totaling ~817.5K SF); 2026 timing reiterated in recent cycle reporting; remains one of the few true future big‑box options. (bisnow.com)
  • First Aurora Commerce Center (CBRE) — scalable program to ~1.29 MSF; active marketing; BTS windows give path to late‑2026 delivery for larger requirements. (cbre.com)

Sources (full URLs)


Market context (Q3–Q4 2025 tone)

  • Supply pipeline remains light into 2026 relative to recent years, with DIA‑east assets benefiting from the imminent Picadilly DDI. Q4 data prints are pending, but the “low pipeline/tighter big‑box ahead” narrative remains consistent with 2025 trend reports. (auroragov.org)

Sources (full URLs)


Quick‑hit picks to add to early‑January tours

  1. Aurora Commerce Center — ±66K–173K SF; Class A; March 2025 delivery; trailer parking; EZ/OZ adjacency near DDI.
    https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-174072/aurora-commerce-center-22100-east-26th-avenue-aurora-co-80019

  2. Picadilly Crossing — two buildings totaling ±513K SF; for sale or lease; Q4 2026 delivery; Stream leasing.
    https://streamrealty.com/stream-realty-partners-awarded-leasing-and-management-by-brennan-investment-group-for-picadilly-crossing-in-greater-denver/

  3. North I‑25 comps for underwriting — 25 North (refi) and Innovate 25 (presale) to help triangulate pricing for Thornton/NoCo pursuits.
    https://www.jll.com/en-us/newsroom/jll-secures-refinancing-for-25-north-in-denver
    https://www.bisnow.com/denver/news/industrial/posiflex-buys-thornton-industrial-stream-131107

If you’d like, I can roll this into a broker‑verified matrix (clear heights, docks/DI, trailer/yard, power/cranes, OS rights, zoning/tax, asking/TI/concessions) plus a refreshed comp sheet with geocoded drive‑time rings from DIA and population centroids.