# Fresh Updates on Front Range Industrial Deals!

Newsy: Denver Industrial Real Estate
Published: 2026-01-11T14:02:00.597Z
Source: https://newsyai.com/edition/0a37bea0-a65d-453a-9af4-cd20763ea15f
Archive: https://newsyai.com/newsy/a39e5ebf-1943-41e2-b44d-ec38fbcc0415.md

---

# Front Range Industrial: January 11, 2026 — Only what’s newly confirmed

Institutional‑grade industrial across the Denver MSA (Fort Collins to Castle Rock): development, acquisitions, leasing/marketing, for sale/for lease, land, and big‑box/manufacturing. This edition highlights items that moved or were freshly re‑verified today.

## What changed or was confirmed today

- I‑70/Picadilly Diverging Diamond Interchange — still “projected for early January,” with finishing work into spring 2026; no official “fully open” notice posted as of today. Weekly update reiterates the Colfax EB on‑ramp detour and early‑2026 closures on segments of Picadilly Road. ([auroragov.org](https://www.auroragov.org/I70picadilly?utm_source=openai))  
  Sources (full URLs):  
  - https://www.auroragov.org/I70picadilly  
  - https://www.auroragov.org/news/whats_new/road_construction_updates

- Market data — CBRE’s Denver Industrial Figures Q4 2025 remains the latest: direct vacancy 7.5% (−10 bps QoQ), Q4 net absorption +1.0 MSF; 2025 total +3.6 MSF; pipeline ~3.3 MSF; Q4 leasing 2.9 MSF; Q4 sales $575M. Posted January 8, 2026. ([cbre.com](https://www.cbre.com/insights/figures/denver-industrial-figures-q4-2025?utm_source=openai))  
  Sources (full URLs):  
  - https://www.cbre.com/insights/figures/denver-industrial-figures-q4-2025

- DIA‑east pipeline — schedules unchanged in the past few days: Aero 70 lists Phase 1 “Now Under Construction | Delivering Q1 2026.” EastPark 70 Building 7 maintains Q4 2025 delivery/specs. ([aero70.com](https://www.aero70.com/?utm_source=openai))  
  Sources (full URLs):  
  - https://www.aero70.com/  
  - https://eastpark70.cbre-properties.com/

---

## Fresh marketing and availability checks (Class A, institutional)

- Central infill (tour‑ready)  
  - Broadway Logistics Center (Lovett) — ±145,746 SF contiguous remaining; 32’ clear; 57 docks; delivered 2024; availability pages refreshed within the last 2–3 weeks. ([cushmanwakefield.com](https://www.cushmanwakefield.com/en/united-states/properties/for-lease/warehousedistribution/co/denver/6795-broadway-street/s121269557s121289057-l?utm_source=openai))  
    Sources:  
    - https://www.cushmanwakefield.com/en/united-states/properties/for-lease/warehousedistribution/co/denver/6795-broadway-street/s121269557s121289057-l  
    - https://www.loopnet.com/Listing/6795-Broadway-St-Denver-CO/27009058/  
  - Downtown Distribution Center — single‑tenant ±134,368 SF; unincorporated Adams County tax advantage; listing active as of last week. ([cushmanwakefield.com](https://www.cushmanwakefield.com/en/united-states/properties/for-lease/warehousedistribution/co/denver/5601-franklin-street/s121100029s121100048-l?utm_source=openai))  
    Sources:  
    - https://www.cushmanwakefield.com/en/united-states/properties/for-lease/warehousedistribution/co/denver/5601-franklin-street/s121100029s121100048-l  
    - https://www.downtowndistributionden.com/

  - 5950 Washington St — new construction, ±97,336 SF, divisible to ~24K; 32’ clear; EZ/OZ benefits; both the project site and third‑party portals show current availability and late‑2025 completion. ([5950washingtonstreet.com](https://www.5950washingtonstreet.com/?utm_source=openai))  
    Sources:  
    - https://www.5950washingtonstreet.com/  
    - https://www.loopnet.com/Listing/5950-Washington-St-Denver-CO/30143172/  
    - https://www.loopnet.com/Listing/5950-Washington-St-Denver-CO/34650733/

- DIA/I‑70‑east big‑box/spec  
  - Aero 70 (United Properties/CBRE) — Phase 1 under construction; Q1 2026 delivery; Building 1: 419,070 SF (36’ CH); Building 2: 398,405 SF (32’ CH); heavy trailer counts and power published. ([aero70.com](https://www.aero70.com/?utm_source=openai))  
    Source:  
    - https://www.aero70.com/  
  - EastPark 70 – Building 7 — 117,493 SF front‑load; divisible to ±30K; 32’ CH; Q4 2025 delivery; outside storage approval noted on park page. ([eastpark70.cbre-properties.com](https://eastpark70.cbre-properties.com/?utm_source=openai))  
    Sources:  
    - https://eastpark70.cbre-properties.com/  
    - https://www.loopnet.com/Listing/2379-S-Ensenada-St-Aurora-CO/21393050/  
  - Picadilly Crossing (Brennan/Stream) — two buildings totaling ±513K SF for lease/sale; Stream awarded leasing/management Nov 10, 2025; late‑2026 target at award remains. ([streamrealty.com](https://streamrealty.com/stream-realty-partners-awarded-leasing-and-management-by-brennan-investment-group-for-picadilly-crossing-in-greater-denver/?utm_source=openai))  
    Sources:  
    - https://streamrealty.com/stream-realty-partners-awarded-leasing-and-management-by-brennan-investment-group-for-picadilly-crossing-in-greater-denver/  
    - https://milehighcre.com/stream-realty-partners-awarded-leasing-and-management-for-picadilly-crossing/  
  - Aurora Commerce Center — ±66K–173,148 SF; March 2025; EZ/OZ adjacency; listing refreshed within the last month. ([cbre.com](https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-174072/aurora-commerce-center-22100-east-26th-avenue-aurora-co-80019?utm_source=openai))  
    Source:  
    - https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-174072/aurora-commerce-center-22100-east-26th-avenue-aurora-co-80019  
  - First Aurora Commerce Center (First Industrial/CBRE) — park scale to ±1.29 MSF; buildings E/H/A/B shown; “buildings can be built in ~10 months.” Pages updated this week. ([first-aurora-commerce-center.cbre-properties.com](https://first-aurora-commerce-center.cbre-properties.com/?utm_source=openai))  
    Sources:  
    - https://first-aurora-commerce-center.cbre-properties.com/  
    - https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-121446/first-aurora-commerce-center-22600-east-26th-avenue-aurora-co-80019  
  - Prologis central/infill options — Business Center Bldg 2 shows 55K–133,602 SF available now; Park Central Bldg 1 lists 21,896 SF with October 2026 availability. Re‑verified this week. ([prologis.com](https://www.prologis.com/industrial-properties/building/den00902-prologis-business-center-building-2?utm_source=openai))  
    Sources:  
    - https://www.prologis.com/industrial-properties/building/den00902-prologis-business-center-building-2  
    - https://www.prologis.com/industrial-properties/building/den01701-prologis-park-central-building-1

---

## Newly confirmed comps (lease, sale, land) — big‑box, manufacturing, mid‑box

- Leases  
  - GOFO/US Elogistics — 72,735 SF at 19100 E. 38th Ave., Aurora (posted Dec 5, 2025) — mid‑box benchmark in the DIA corridor. ([businessden.com](https://businessden.com/2025/12/05/the-pipeline-commercial-real-estate-deals-for-12-5-25/?utm_source=openai))  
    Source:  
    - https://businessden.com/2025/12/05/the-pipeline-commercial-real-estate-deals-for-12-5-25/  
  - Pretred Inc. — 152,034 SF, 10‑year lease at Denali Logistics Park; occupancy targeted May 2026 after TIs. (Context for manufacturing/distribution demand.) ([milehighcre.com](https://milehighcre.com/cbre-arranges-largest-speculative-industrial-lease-in-colorado/?utm_source=openai))  
    Source:  
    - https://milehighcre.com/cbre-arranges-largest-speculative-industrial-lease-in-colorado/  
  - Northern Colorado: Black Label Services — 80,809 SF crane‑served lease at 120 NE Frontage Rd., Fort Collins (July 17, 2025). ([cushmanwakefield.com](https://www.cushmanwakefield.com/en/united-states/news/2025/07/arranges-new-lease-at-120-ne-frontage-road-in-fort-collins?utm_source=openai))  
    Sources:  
    - https://www.cushmanwakefield.com/en/united-states/news/2025/07/arranges-new-lease-at-120-ne-frontage-road-in-fort-collins  
    - https://www.rentv.com/content/southwest/mainnews/news/33064

- Capital markets / notable user purchases  
  - Central Denver infill portfolio — 1.6M SF, 16 buildings; largest Colorado industrial trade since 2022; buyer: Harrison Properties (Q4 2025). ([cbre.com](https://www.cbre.com/press-releases/cbre-arranges-sale-of-1-6-million-sf-16-building-industrial-portfolio?utm_source=openai))  
    Source:  
    - https://www.cbre.com/press-releases/cbre-arranges-sale-of-1-6-million-sf-16-building-industrial-portfolio  
  - Alterra IOS acquisitions — two‑property IOS portfolio including Brighton asset (Denver MSA) closed Dec 2025; JLL advised seller. ([milehighcre.com](https://milehighcre.com/industrial-outdoor-storage-portfolio-trades-hands/?utm_source=openai))  
    Sources:  
    - https://milehighcre.com/industrial-outdoor-storage-portfolio-trades-hands/  
    - https://rebusinessonline.com/bespoke-holdings-co-sells-67508-sf-industrial-outdoor-storage-portfolio-in-colorado/  
    - https://www.bisnow.com/denver/news/deal-sheet/alterra-ios-buys-denver-area-outdoor-storage-sites-the-denver-deal-sheet-132206

- Operations/cold‑chain signal  
  - Food Bank of the Rockies hub — new Aurora distribution center operational; address confirmed (20600 E. 38th Ave., Aurora). Useful directional comp for cold‑storage capable and high‑throughput user demand in DIA‑east. ([foodbankrockies.org](https://www.foodbankrockies.org/about/contact-us/?utm_source=openai))  
    Source:  
    - https://www.foodbankrockies.org/about/contact-us/

---

## Development tracker (big‑box and manufacturing)

- Aero 70 — two cross‑dock specs under construction; Q1 2026 delivery; BTS/land paths remain active. ([aero70.com](https://www.aero70.com/?utm_source=openai))  
  Source:  
  - https://www.aero70.com/

- EastPark 70 Building 7 — 117,493 SF under construction; Q4 2025 target; divisible to ±30K; 32’ clear; outside storage approved at park. ([eastpark70.cbre-properties.com](https://eastpark70.cbre-properties.com/?utm_source=openai))  
  Source:  
  - https://eastpark70.cbre-properties.com/

- Picadilly Crossing — Stream’s November 2025 award confirmed; program totals ±513K SF for sale/lease; late‑2026 delivery at award. ([streamrealty.com](https://streamrealty.com/stream-realty-partners-awarded-leasing-and-management-by-brennan-investment-group-for-picadilly-crossing-in-greater-denver/?utm_source=openai))  
  Source:  
  - https://streamrealty.com/stream-realty-partners-awarded-leasing-and-management-by-brennan-investment-group-for-picadilly-crossing-in-greater-denver/

- First Aurora Commerce Center — multi‑building program (A/B/H/E) with divisibility and ±10‑month build windows; up to ~1.29 MSF. ([first-aurora-commerce-center.cbre-properties.com](https://first-aurora-commerce-center.cbre-properties.com/?utm_source=openai))  
  Sources:  
  - https://first-aurora-commerce-center.cbre-properties.com/  
  - https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-121446/first-aurora-commerce-center-22600-east-26th-avenue-aurora-co-80019

---

## Active “for lease / for sale” — institutional shortlist (newly reconfirmed)

- Central infill  
  - Broadway Logistics Center — up to ±145,746 SF; 32’ CH; 57 docks. ([cushmanwakefield.com](https://www.cushmanwakefield.com/en/united-states/properties/for-lease/warehousedistribution/co/denver/6795-broadway-street/s121269557s121289057-l?utm_source=openai))  
    Source:  
    - https://www.cushmanwakefield.com/en/united-states/properties/for-lease/warehousedistribution/co/denver/6795-broadway-street/s121269557s121289057-l  
  - Downtown Distribution Center — ±134,368 SF single‑tenant. ([cushmanwakefield.com](https://www.cushmanwakefield.com/en/united-states/properties/for-lease/warehousedistribution/co/denver/5601-franklin-street/s121100029s121100048-l?utm_source=openai))  
    Source:  
    - https://www.cushmanwakefield.com/en/united-states/properties/for-lease/warehousedistribution/co/denver/5601-franklin-street/s121100029s121100048-l  
  - 5950 Washington St — ±97,336 SF, divisible; EZ/OZ. ([loopnet.com](https://www.loopnet.com/Listing/5950-Washington-St-Denver-CO/30143172/?utm_source=openai))  
    Source:  
    - https://www.loopnet.com/Listing/5950-Washington-St-Denver-CO/30143172/

- DIA/I‑70 east  
  - EastPark 70 – Building 7 — 117,493 SF delivering Q4 2025. ([eastpark70.cbre-properties.com](https://eastpark70.cbre-properties.com/?utm_source=openai))  
    Source:  
    - https://eastpark70.cbre-properties.com/  
  - Aurora Commerce Center — ±66K–173K SF; March 2025. ([cbre.com](https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-174072/aurora-commerce-center-22100-east-26th-avenue-aurora-co-80019?utm_source=openai))  
    Source:  
    - https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-174072/aurora-commerce-center-22100-east-26th-avenue-aurora-co-80019  
  - First Aurora Commerce Center — multiple paths from 100K to 1.29 MSF; ±10‑month build. ([cbre.com](https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-121446/first-aurora-commerce-center-22600-east-26th-avenue-aurora-co-80019?utm_source=openai))  
    Source:  
    - https://www.cbre.com/properties/properties-for-lease/industrial/details/US-SMPL-121446/first-aurora-commerce-center-22600-east-26th-avenue-aurora-co-80019  
  - Prologis Business Center Bldg 2 — 55K–133,602 SF available now (Airport/I‑70). ([prologis.com](https://www.prologis.com/industrial-properties/building/den00902-prologis-business-center-building-2?utm_source=openai))  
    Source:  
    - https://www.prologis.com/industrial-properties/building/den00902-prologis-business-center-building-2

---

## Quick underwriting context (as of January 11, 2026)

- Fundamentals tightened into year‑end: direct vacancy at 7.5%; 2025 absorption +3.6 MSF; construction pipeline ~3.3 MSF; strongest quarterly leasing of 2025 at 2.9 MSF. Expect a selectively tighter 2026 backdrop as new starts remain muted. ([cbre.com](https://www.cbre.com/insights/figures/denver-industrial-figures-q4-2025?utm_source=openai))  
  Source:  
  - https://www.cbre.com/insights/figures/denver-industrial-figures-q4-2025

- Access watch: I‑70/Picadilly full activation still pending “early January”; anticipate minor route variability and finishing work into spring 2026 when modeling drive‑times for DIA‑adjacent assets. ([auroragov.org](https://www.auroragov.org/I70picadilly?utm_source=openai))  
  Sources:  
  - https://www.auroragov.org/I70picadilly  
  - https://www.auroragov.org/news/whats_new/road_construction_updates

---

## Want a deeper dive?

I can compile a broker‑verified matrix (clear heights, loading, trailer/yard, power/cranes, tax/zoning, current ask/TI/concessions) and a refreshed comp book with DIA and labor‑shed drive‑times for the above shortlist.
