Front Range Industrial: Fresh Developments Unveiled!

Front Range Industrial: January 25, 2026 — Only what’s newly confirmed

Institutional‑grade industrial across the Denver MSA (Ft. Collins to Castle Rock): development, acquisitions, leasing/marketing, for sale/for lease, land, and big‑box/manufacturing. This edition flags items posted or re‑verified since January 24.

What moved since yesterday

  • I‑70/Picadilly DDI — City of Aurora pages continue to show “early 2026” for opening; weekly notices still call for alternating lane closures and ramp work. Keep DIA‑east drive‑time friction in models through spring 2026 while finishing work continues. (auroragov.org)

  • DIA‑adjacent multi‑tenant options refreshed — JAG Logistics Center at DEN has multiple small-to-mid bay availabilities now live/updated in January, including Trade II (±4K–37K SF), Trade III (±4K–64K SF), and Trade IV (±4K–50K SF) with mezzanine office components; Airport District/NEP‑I70 zoning allows broad industrial uses including outside storage. Useful for overflow and flexing headcount near cargo corridors. (loopnet.com)

  • North I‑25 availability check — Rockefeller Group’s 25 Commerce Park page remains current with Building 1 showing ±131,250 SF available with sale or lease paths, spec office and trailer stalls; FTZ‑enabled services noted. Good infill‑north alternative with Grant/144th connectivity. (rockefellergroup.com)

  • Park‑scale big‑box: Denali Logistics Park — Listing remains active for proposed Building 8 at ±1,209,000 SF (2026) and total park availability near ±2.77 MSF across multiple buildings; a credible BTS target adjacent to DEN. (loopnet.com)

Fresh lease, sale and land comps (new/re‑verified)

  • Lease — Distribution (I‑76 corridor): Advance Auto Parts/Advance Stores Inc., 178,000 SF, 7‑year term at Ascent Commerce Center, Building II (Commerce City). Confirmed Jan 20–21 coverage; building now fully leased per owner update. Use as a current Class‑A mid-/big‑box benchmark. (bisnow.com)

  • Lease — Manufacturing (DIA‑east): Pretred Inc., 152,034 SF, 10‑year lease at Denali Logistics Park; occupancy targeted May 2026 after improvements. Heavy‑power manufacturing precedent in the airport submarket. (milehighcre.com)

  • Lease — Manufacturing (NoCo): Trystar, 33,802 SF at 3810 Vander Meer Dr., Loveland (Boyd Lake Commerce Center). Posted Jan 15, 2026; good NoCo user benchmark. (milehighcre.com)

  • Lease — Industrial/distribution (DIA‑south): PMI/ZYN, 150,000 SF at 25000 E. 56th Ave. (Sun Empire). Earlier‑cycle but relevant big‑box user commitment proximal to planned $600M factory. (businessden.com)

Inventory to price and tour (new or newly re‑checked)

  • Prologis Business Center, Bldg 2 (5025 Florence St., Denver) — “Available Now,” 55K–133,602 SF; 30′ clear; 15 docks, 3 drive‑ins, ESFR; central/airport infill. Page re‑verified this week. (prologis.com)

  • JAG Logistics Center @ DEN — Multiple suites from ±4K to ±64K SF across Trades II–V; mezzanine office options; AD/NEP‑I70 zoning; strong trailer/auto parking ratios. Good near‑term, tour‑ready DIA options. (loopnet.com)

  • 25 Commerce Park (Thornton, Rockefeller Group) — Building 1 still showing ±131,250 SF with sale/lease optionality, spec office, trailer stalls; FTZ‑enabled services; infill‑north coverage. (rockefellergroup.com)

  • 470 Commerce (Aurora — Newmark marketing) — Phase program shows initial three buildings totaling ±526K SF; Phase 2 outlines additional mid‑box options. Flexible structures include leases, user sales, land sales (10–170 acres) and BTS; current materials show May/Sept 2026 availability targets. Useful forward‑pipeline context east of E‑470. (loopnet.com)

  • Denali Logistics Park (Hines/Colliers) — Proposed Bldg 8 to ±1,209,000 SF; park availabilities currently marketed at ±2.77 MSF. BTS‑scale immediately adjacent to DEN cargo corridors. (loopnet.com)

Market data (latest verified)

  • CBRE Denver Industrial Figures Q4 2025 (published Jan 8, 2026): direct vacancy 7.5%; Q4 net absorption +1.0 MSF (full‑year 2025 +3.6 MSF); Q4 leasing 2.9 MSF; Q4 sales $575M; pipeline ~3.3 MSF. Implication: tightening big‑box options into late‑2026 as speculative starts slow. (cbre.com)

Access and infrastructure watch

  • I‑70/Picadilly Diverging Diamond Interchange — City pages maintain “early 2026” opening guidance; intermittent closures and reduced speed limits persist; finishing work through spring 2026. Plan tours and trucking accordingly. (auroragov.org)

Quick comp sheet — add these to models

  • Lease (Distribution, I‑76): Advance Auto Parts, 178,000 SF, Ascent Commerce Center; 7‑year term; signed Dec 2025; reported Jan 20–21, 2026. (bisnow.com)
  • Lease (Manufacturing, DIA‑east): Pretred Inc., 152,034 SF, Denali Logistics Park; occupancy targeted May 2026 after TIs. (milehighcre.com)
  • Lease (Manufacturing, NoCo): Trystar, 33,802 SF, Boyd Lake Commerce Center (Loveland); posted Jan 15, 2026. (milehighcre.com)
  • Lease (Industrial, DIA‑south): PMI/ZYN, 150,000 SF at Sun Empire; late‑2025 execution for 2026 ramp. (businessden.com)

Notes on comps and data hygiene

  • Availability, door counts, clear heights and dates above were checked against current owner/park pages or active listings on January 25, 2026; rely on owner pages as source‑of‑truth where broker portals conflict. (prologis.com)

Sources: City of Aurora live project pages and weekly roadwork notices; CBRE market figures; owner/park and active listings for Prologis Business Center Bldg 2, JAG Logistics Center @ DEN, 25 Commerce Park, Denali Logistics Park, and 470 Commerce; transaction reporting from BusinessDen, Mile High CRE, and Bisnow. (auroragov.org)